Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn as follows:
- Has relationships with 3 contractor.
- Announced 9 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 26 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 22 packages that have not fully posted the contractor selection results. Of these 22 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 16.67%, Construction 33.33%, Consultancy 50.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,744,292,000 VND, of which the total winning bid value is: 3,558,143,991 VND.
- The savings rate is: 4.97%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 16.67%, Construction 33.33%, Consulting 50.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,744,292,000 VND, in which the total winning value is: 3,558,143,991 VND.
- The savings rate is: 4.97%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 9 investment and development projects.
- As the owner of 13 Contractor selection plan in which 13 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 6 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Project contractor selection plan: Repair and maintenance of Binh Minh I dike surface in Binh Minh town, Kim Son district of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 2 bidding package.
20/07/2023 08:55
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Project contractor selection plan: Upgrading and renovating the road from hamlet 10, Nhu Hoa commune to hamlet 12, Kim Chinh commune (through 2 districts of Kim Son, Yen Khanh) of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 4 bidding package.
20/07/2023 08:47
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Upgrading and renovating the road from hamlet 10, Nhu Hoa commune to hamlet 12, Kim Chinh commune (through 2 districts of Kim Son, Yen Khanh).
12/07/2023 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Plan for contractor selection of bidding packages for surveying consultancy, preparation of feasibility study reports and consulting for preparation of project environmental impact assessment reports: Construction of rescue and rescue roads in service of flood and storm control section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 2 bidding package.
04/07/2023 10:46
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Project's contractor selection plan: Investment in building infrastructure of new rural residential areas in 3 communes Tan Thanh, Yen Loc, Dinh Hoa (phase 1) of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 1 bidding package.
04/07/2023 10:15
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Investment in building infrastructure of new rural residential areas in 3 communes Tan Thanh, Yen Loc, Dinh Hoa (phase 1).
04/07/2023 10:10
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Making an environmental impact assessment report for the construction of a rescue and rescue road for flood and storm control, the section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province.
04/07/2023 10:10
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Survey, prepare feasibility study report for the project of Construction of a rescue and rescue road for flood and storm control, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province.
04/07/2023 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Plan for contractor selection of bidding packages for geological survey consultancy, topographic survey consultancy, feasibility study report preparation and project environmental impact assessment report consultancy: Construction of a rescue road , rescue service for flood and storm prevention, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 3 bidding package.
03/07/2023 13:46
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request contractor selection plan, package survey, preparation of economic and technical reports of the project: Moving medium and low voltage lines for project construction Investment and construction of DT 482 route connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh Province of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 1 bidding package.
03/07/2023 10:36
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Project contractor selection plan: Repair and maintenance of Binh Minh I dike surface in Binh Minh town, Kim Son district with 2 bidding package .
20/07/2023 08:55
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Project contractor selection plan: Upgrading and renovating the road from hamlet 10, Nhu Hoa commune to hamlet 12, Kim Chinh commune (through 2 districts of Kim Son, Yen Khanh) with 4 bidding package .
20/07/2023 08:47
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Plan for contractor selection of bidding packages for surveying consultancy, preparation of feasibility study reports and consulting for preparation of project environmental impact assessment reports: Construction of rescue and rescue roads in service of flood and storm control section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province with 2 bidding package .
04/07/2023 10:46
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Project's contractor selection plan: Investment in building infrastructure of new rural residential areas in 3 communes Tan Thanh, Yen Loc, Dinh Hoa (phase 1) with 1 bidding package .
04/07/2023 10:15
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Plan for contractor selection of bidding packages for geological survey consultancy, topographic survey consultancy, feasibility study report preparation and project environmental impact assessment report consultancy: Construction of a rescue road , rescue service for flood and storm prevention, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province with 3 bidding package .
03/07/2023 13:46
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan contractor selection plan, package survey, preparation of economic and technical reports of the project: Moving medium and low voltage lines for project construction Investment and construction of DT 482 route connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh Province with 1 bidding package .
03/07/2023 10:36
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn announced the results of the bid package Appraisal of project equipment Procurement of equipment for meeting rooms, function rooms Kim Son District Party Committee Headquarters and ancillary items .
- Winning bidder:
30/06/2023 10:17
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Plan for selecting contractor for the project Relocating the 0.4kV line, the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the project construction invest in the construction of a coastal road, the section through Ninh Binh province (phase I) in the area of Kim Son district with 4 bidding package .
09/06/2023 10:46
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn publishes the plan Plan for contractor selection for survey package, preparation of project technical and economic report Relocation of 0.4kV transmission line of substations using self-priming pumps in Con Thoi, Con Thoi 6 and 22kV line branching off Con Thoi pump substation, Highway 473E23.4 Kim My serves the construction of the coastal road construction investment project, the section through Ninh Binh province (phase I) in Kim Son district. with 1 bidding package .
09/06/2023 10:16
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn announced the results of the bid package Consulting on making economic-technical reports under the project: Renovating and upgrading the old People's Procuracy headquarters, Kim Son district (to serve the work of the Kim Son Land Registry Office Branch) .
- Winning bidder:
02/06/2023 07:38
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Project contractor selection plan: Repair and maintenance of Binh Minh I dike surface in Binh Minh town, Kim Son district of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 2 bidding package.
20/07/2023 08:55
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Project contractor selection plan: Upgrading and renovating the road from hamlet 10, Nhu Hoa commune to hamlet 12, Kim Chinh commune (through 2 districts of Kim Son, Yen Khanh) of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 4 bidding package.
20/07/2023 08:47
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Upgrading and renovating the road from hamlet 10, Nhu Hoa commune to hamlet 12, Kim Chinh commune (through 2 districts of Kim Son, Yen Khanh).
12/07/2023 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Plan for contractor selection of bidding packages for surveying consultancy, preparation of feasibility study reports and consulting for preparation of project environmental impact assessment reports: Construction of rescue and rescue roads in service of flood and storm control section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 2 bidding package.
04/07/2023 10:46
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Project's contractor selection plan: Investment in building infrastructure of new rural residential areas in 3 communes Tan Thanh, Yen Loc, Dinh Hoa (phase 1) of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 1 bidding package.
04/07/2023 10:15
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Investment in building infrastructure of new rural residential areas in 3 communes Tan Thanh, Yen Loc, Dinh Hoa (phase 1).
04/07/2023 10:10
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Making an environmental impact assessment report for the construction of a rescue and rescue road for flood and storm control, the section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province.
04/07/2023 10:10
Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn Posted Development Investment Project Survey, prepare feasibility study report for the project of Construction of a rescue and rescue road for flood and storm control, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province.
04/07/2023 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request Plan for contractor selection of bidding packages for geological survey consultancy, topographic survey consultancy, feasibility study report preparation and project environmental impact assessment report consultancy: Construction of a rescue road , rescue service for flood and storm prevention, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 3 bidding package.
03/07/2023 13:46
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted the request contractor selection plan, package survey, preparation of economic and technical reports of the project: Moving medium and low voltage lines for project construction Investment and construction of DT 482 route connecting National Highway 1A with National Highway 10 and connecting National Highway 10 with National Highway 12B, Ninh Binh Province of the investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn with 1 bidding package.
03/07/2023 10:36
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted 13 of the contractor selection plan, which contains 26 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted 6 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 8 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn is the investor of 6 package, of which 6 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn is the owner of 13 contractor selection plan. In which, they self-invite 13 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn is an investor with 3 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Kim Sơn is the investor of 9 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register