Plan for contractor selection for survey package, preparation of project technical and economic report Relocation of 0.4kV transmission line of substations using self-priming pumps in Con Thoi, Con Thoi 6 and 22kV line branching off Con Thoi pump substation, Highway 473E23.4 Kim My serves the construction of the coastal road construction investment project, the section through Ninh Binh province (phase I) in Kim Son district.
Plan for contractor selection for survey package, preparation of project technical and economic report Relocation of 0.4kV transmission line of substations using self-priming pumps in Con Thoi, Con Thoi 6 and 22kV line branching off Con Thoi pump substation, Highway 473E23.4 Kim My serves the construction of the coastal road construction investment project, the section through Ninh Binh province (phase I) in Kim Son district.
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QĐ PD KHLCNT TVTK.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Consulting, surveying, preparing technical reports for the project Relocating the 0.4kV transmission line of the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching to the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the test. Construction investment project of coastal road, section through Ninh Binh province (phase I) in Kim Son district
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for contractor selection for survey package, preparation of project technical and economic report Relocation of 0.4kV transmission line of substations using self-priming pumps in Con Thoi, Con Thoi 6 and 22kV line branching off Con Thoi pump substation, Highway 473E23.4 Kim My serves the construction of the coastal road construction investment project, the section through Ninh Binh province (phase I) in Kim Son district.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for contractor selection for survey package, preparation of project technical and economic report Relocation of 0.4kV transmission line of substations using self-priming pumps in Con Thoi, Con Thoi 6 and 22kV line branching off Con Thoi pump substation, Highway 473E23.4 Kim My serves the construction of the coastal road construction investment project, the section through Ninh Binh province (phase I) in Kim Son district." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.