Plan for selecting contractor for the project Relocating the 0.4kV line, the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the project construction invest in the construction of a coastal road, the section through Ninh Binh province (phase I) in the area of ​​Kim Son district

  Watching  
Project Contractor selection plan Bid award
Find: 10:51 09/06/2023
Contractor Selection Plan ID
PL2300091121-00
Publishing time
10:46 09/06/2023
Posting Status
Published
Contractor selection plan name
Plan for selecting contractor for the project Relocating the 0.4kV line, the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the project construction invest in the construction of a coastal road, the section through Ninh Binh province (phase I) in the area of ​​Kim Son district
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300025210-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
1 Years
Location
Authority that issues the decision
uỷ ban nhân dân huyện Kim Sơn
Approval date
06/06/2023
Approval ID
3861/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.project construction insurance Moving the 0.4kV line of the substations using the Con Thoi, Con Thoi 6 pumps and the 22kV branching to the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the construction of the construction investment project construction of a coastal road, the section through Ninh Binh province (phase I) in Kim Son district
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
From the cost of site clearance of the investment project to build a coastal road, the section through Ninh Binh province (phase 1).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Kim Sơn District, Ninh Bình
2.Project supervision consultant Moving the 0.4kV transmission line of the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching to the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the construction of the investment project to build a coastal road, the section through Ninh Binh province (phase I) in Kim Son district
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
From the cost of site clearance of the investment project to build a coastal road, the section through Ninh Binh province (phase 1).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Kim Sơn District, Ninh Bình
3.Independent project audit Relocating the 0.4kV line of the substations using the Con Thoi and Con Thoi 6 pumps and the 22kV branching to the Con Thoi pump substation, Highway 473E23.4, Kim My cutting station serving the construction of the construction investment project construction of a coastal road, the section through Ninh Binh province (phase I) in Kim Son district
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
From the cost of site clearance of the investment project to build a coastal road, the section through Ninh Binh province (phase 1).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Location
Kim Sơn District, Ninh Bình
4.Bidding package for construction and installation of project Relocating 0.4kV line of substations using Con Thoi pump, Con Thoi 6 pump and 22kV line branching to Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the construction of the first project To invest in the construction of a coastal road, the section through Ninh Binh province (phase I) in the area of ​​Kim Son district
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
From the cost of site clearance of the investment project to build a coastal road, the section through Ninh Binh province (phase 1).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Kim Sơn District, Ninh Bình

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractor for the project Relocating the 0.4kV line, the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the project construction invest in the construction of a coastal road, the section through Ninh Binh province (phase I) in the area of ​​Kim Son district". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractor for the project Relocating the 0.4kV line, the substations using the Con Thoi pump, Con Thoi 6 pump and the 22kV branch branching the Con Thoi pump substation, Highway 473E23.4 Kim My cutting station to serve the project construction invest in the construction of a coastal road, the section through Ninh Binh province (phase I) in the area of ​​Kim Son district" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second