Survey, prepare feasibility study report for the project of Construction of a rescue and rescue road for flood and storm control, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300030041-00
Notice type
Real announcement
Project name
Survey, prepare feasibility study report for the project of Construction of a rescue and rescue road for flood and storm control, section from National Highway 10 to Huu Day dike, Kim Son district, Ninh Binh province
Authority
Kim Son District People's Committee
Project approval ID
4070/QĐ-UBND
Project approval date
19/06/2023
Approval authority
Ủy ban nhân dân huyện Kim Sơn
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet