Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION as follows:
- Has relationships with 14 contractor.
- Announced 25 investment development project, of which 22 projects have not yet announced the prequalification documents.
- Announced 39 contractor selection plans with a total of 59 bidding packages, of which 20 prequalification documents have not found the investment project.
- Has invited bids for 94 packages (with 99 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 15 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 54 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 12.12%, Construction 25.25%, Consultancy 52.53%, Non-consultancy 10.10%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 27,705,894,062 VND, of which the total winning bid value is: 26,124,330,979 VND.
- The savings rate is: 5.71%.
Data analysis results of DauThau.info software for bid solicitors THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 12.12%, Construction 25.25%, Consulting 52.53%, Non-consulting 10.10%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 27,705,894,062 VND, in which the total winning value is: 26,124,330,979 VND.
- The savings rate is: 5.71%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 25 investment and development projects.
- As the owner of 39 Contractor selection plan in which 39 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 99 bidding packages in which 99 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice transport 110kV MBA transformer of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
14/07/2023 08:19
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Procurement of materials and equipment of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
14/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Renovating 35kV loop circuit at 110kV Nui 1 station - Thieu Yen 110kV station; Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station; Renovating 22kV loop circuit of Ha Trung 110kV station - Bim Son 110kV station; Renovating 35kV loop circuit at Cam Thuy 110kV station- Bim Son 110kV station; Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC).
13/07/2023 17:17
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Renovating 35kV loop circuit at 110kV Nui 1 station - Thieu Yen 110kV station; Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station; Renovating 22kV loop circuit of Ha Trung 110kV station - Bim Son 110kV station; Renovating 35kV loop circuit at Cam Thuy 110kV station- Bim Son 110kV station; Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC).
13/07/2023 15:15
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Improvement of 35kV loop circuit at 110kV Nui 1 station - 110kV Thieu Yen station.
13/07/2023 07:07
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Supervision consultancy of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
11/07/2023 07:33
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Civil Works of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
11/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC).
10/07/2023 15:15
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Civil Works of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
06/07/2023 14:03
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Supervision consultancy of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
04/07/2023 14:47
The data sheet has been partially hidden, to see the full information please Login or Register
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice transport 110kV MBA transformer in the form Open bidding .
14/07/2023 08:19
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Procurement of materials and equipment in the form Open bidding .
14/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Supervision consultancy in the form Open bidding .
11/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Civil Works in the form Open bidding .
11/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Civil Works in the form Open bidding .
06/07/2023 14:03
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Supervision consultancy in the form Open bidding .
04/07/2023 14:47
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station with 2 bidding package .
04/07/2023 14:31
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Civil Works in the form Open bidding .
04/07/2023 14:14
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Supervision consultancy in the form Open bidding .
03/07/2023 17:16
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Renovating 35kV loop circuit of 110kV Cam Thuy station - 110kV Bim Son station with 2 bidding package .
03/07/2023 14:16
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice transport 110kV MBA transformer of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
14/07/2023 08:19
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Procurement of materials and equipment of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
14/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Renovating 35kV loop circuit at 110kV Nui 1 station - Thieu Yen 110kV station; Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station; Renovating 22kV loop circuit of Ha Trung 110kV station - Bim Son 110kV station; Renovating 35kV loop circuit at Cam Thuy 110kV station- Bim Son 110kV station; Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC).
13/07/2023 17:17
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Renovating 35kV loop circuit at 110kV Nui 1 station - Thieu Yen 110kV station; Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station; Renovating 22kV loop circuit of Ha Trung 110kV station - Bim Son 110kV station; Renovating 35kV loop circuit at Cam Thuy 110kV station- Bim Son 110kV station; Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC).
13/07/2023 15:15
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Improvement of 35kV loop circuit at 110kV Nui 1 station - 110kV Thieu Yen station.
13/07/2023 07:07
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Supervision consultancy of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
11/07/2023 07:33
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Civil Works of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
11/07/2023 07:33
THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION Posted Development Investment Project Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC).
10/07/2023 15:15
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Civil Works of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
06/07/2023 14:03
Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted Tender Notice Supervision consultancy of the investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION with the form Open bidding.
04/07/2023 14:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted 39 of the contractor selection plan, which contains 59 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted 99 Tender Notice in the 94 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted 15 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 15 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION is the investor of 99 package, of which 99 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION is the owner of 39 contractor selection plan. In which, they self-invite 39 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION is an investor with 14 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION is the investor of 25 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code