Renovating 35kV loop circuit at 110kV Nui 1 station - Thieu Yen 110kV station; Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station; Renovating 22kV loop circuit of Ha Trung 110kV station - Bim Son 110kV station; Renovating 35kV loop circuit at Cam Thuy 110kV station- Bim Son 110kV station; Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC)

Watching    
Project Overall procurement plan Contractor selection plan
Found: 17:41 13/07/2023
Project number
PR2300031995-00
Notice type
Real announcement
Project name
Renovating 35kV loop circuit at 110kV Nui 1 station - Thieu Yen 110kV station; Renovating 35kV loop circuit of Hau Loc 110kV station - Nga Son 110kV station; Renovating 22kV loop circuit of Ha Trung 110kV station - Bim Son 110kV station; Renovating 35kV loop circuit at Cam Thuy 110kV station- Bim Son 110kV station; Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC)
Investor ID
vnz000018174
Authority
Northern Power Corporation
Project duration
30 Day
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Implementation location
Thanh Hoa province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1897/QĐ-PCTH
Project approval date
12/07/2023
Approval authority
Công ty Điện lực Thanh Hóa
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

2. QD KHLCNT tập trung GT Trích đo.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
1.293.052.927 VND
Total amount
1.293.052.927 VND
You did not use the site, Click here to remain logged. Timeout: 60 second