Invitation To Bid ( ITB, Tender Notice)

Supervision consultancy

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 07:37 11/07/2023
Notice Status
Published
Category
Consulting
Name of project
Improve the reliability of power supply after 110kV Ha Trung, 110kV Bim Son, 110kV Nga Son, 110kV Nui 1, 110kV West TP, 110kV Bai Tranh, 110KV Nong Cong under the multi-split system (MDMC)
Bidding package name
Supervision consultancy
Contractor Selection Plan ID
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Capital depreciation of Northern Power Corporation
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Two Envelopes
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Time of bid closing
08:00 21/07/2023
Validity of bid documents
60 days
Business lines
Approval ID
1860/QĐ-PCTH
Approval date
10/07/2023 00:00
Approval Authority
Công ty Điện lực Thanh Hóa
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
07:33 11/07/2023
to
08:00 21/07/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
08:00 21/07/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Job category:

Form No. 01A: Bill of Quantities, applied for fixed-price contracts:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1 Giám sát thi công dự án "Nâng cao độ tin cậy cung cấp điện sau các trạm 110kV Hà Trung, 110kV Bỉm Sơn, 110kV Nga Sơn, 110kV Núi 1, 110kV Tây TP, 110kV Bãi Trành, 110KV Nông Cống theo phương án đa chia đa nối (MDMC)" 1 dự án

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors THANH HOA POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION as follows:

  • Has relationships with 14 contractor.
  • The average number of contractors participating in each bidding package is: 0 contractors.
  • Proportion of bidding fields: Goods 12.12%, Construction 25.25%, Consulting 52.53%, Non-consulting 10.10%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 27,705,894,062 VND, in which the total winning value is: 26,124,330,979 VND.
  • The savings rate is: 5.71%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Supervision consultancy". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Supervision consultancy" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Views: 0

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second