Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Project Management Unit No 3 as follows:
- Has relationships with 10 contractor.
- Announced 2 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 2 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 19 packages (with 21 tender notices), and conducted prequalification for 3 packages.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 71.43%, Consultancy 28.57%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 50,295,764,000 VND, of which the total winning bid value is: 48,154,283,000 VND.
- The savings rate is: 4.26%.
Data analysis results of DauThau.info software for bid solicitors Project Management Unit No 3 as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 71.43%, Consulting 28.57%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 50,295,764,000 VND, in which the total winning value is: 48,154,283,000 VND.
- The savings rate is: 4.26%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 2 Contractor selection plan in which 2 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Project Management Unit No 3 has posted the request Approval of the plan on selection of contractor for investment preparation work: Repairing damage to the foundation, road surface section Km148+750 – Km155+730, National Highway 10, Ninh Binh province of the investor Project Management Unit No 3 with 1 bidding package.
29/06/2023 10:27
The Bid solicitor Project Management Unit No 3 has posted the request Approving the Plan for selecting contractors for the preparation of investment Works: Repairing partial damage to the road surface section Km119+200 – Km119+400; Km127 – Km127+250; Km127+400 – Km128+050; Handling unsafe traffic points at Km126+080, National Highway 10, Nam Dinh province. of the investor Project Management Unit No 3 with 1 bidding package.
29/06/2023 10:15
Project Management Unit No 3 Posted Development Investment Project Repairing damaged foundation, road surface section Km148+750 – Km155+730, National Highway 10, Ninh Binh province.
29/06/2023 10:10
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package 4: Construction supervision consultancy of the investor Project Management Unit No 3.
- Winning bidder: CÔNG TY CỔ PHẦN SƠN HẢI
20/06/2023 13:56
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package 4: Construction supervision consultancy of the investor Project Management Unit No 3.
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
16/06/2023 09:47
Bid solicitor Project Management Unit No 3 has posted Tender Notice Tender package No 3: Construction of the investor Project Management Unit No 3 with the form Open bidding.
06/06/2023 11:35
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit No 3.
- Winning bidder: CÔNG TY CỔ PHẦN VIỆT XUÂN HÀ NỘI
02/06/2023 13:56
Bid solicitor Project Management Unit No 3 has posted Tender Notice Tender package No 3: Construction of the investor Project Management Unit No 3 with the form Open bidding.
31/05/2023 15:12
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package No. 2: Consulting Surveying, making construction drawing design and cost estimate of the investor Project Management Unit No 3.
25/05/2023 15:08
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit No 3 publishes the plan Approval of the plan on selection of contractor for investment preparation work: Repairing damage to the foundation, road surface section Km148+750 – Km155+730, National Highway 10, Ninh Binh province with 1 bidding package .
29/06/2023 10:27
Project Management Unit No 3 publishes the plan Approving the Plan for selecting contractors for the preparation of investment Works: Repairing partial damage to the road surface section Km119+200 – Km119+400; Km127 – Km127+250; Km127+400 – Km128+050; Handling unsafe traffic points at Km126+080, National Highway 10, Nam Dinh province. with 1 bidding package .
29/06/2023 10:15
Project Management Unit No 3 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN SƠN HẢI
20/06/2023 13:56
Project Management Unit No 3 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
16/06/2023 09:47
Project Management Unit No 3 publishes Tender Notice Tender package No 3: Construction in the form Open bidding .
06/06/2023 11:35
Project Management Unit No 3 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN HỢP TIẾN, CÔNG TY CỔ PHẦN 379 VIỆT NAM, CÔNG TY CỔ PHẦN VIỆT XUÂN HÀ NỘI
02/06/2023 13:56
Project Management Unit No 3 publishes Tender Notice Tender package No 3: Construction in the form Open bidding .
31/05/2023 15:12
Project Management Unit No 3 announced the results of the bid package Package No. 2: Consulting Surveying, making construction drawing design and cost estimate .
- Winning bidder:
25/05/2023 15:08
Project Management Unit No 3 publishes Tender Notice Package 4: Construction supervision consultancy in the form Open bidding .
25/05/2023 14:28
Project Management Unit No 3 publishes Tender Notice Package 4: Construction supervision consultancy in the form Open bidding .
25/05/2023 14:27
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Management Unit No 3 has posted the request Approval of the plan on selection of contractor for investment preparation work: Repairing damage to the foundation, road surface section Km148+750 – Km155+730, National Highway 10, Ninh Binh province of the investor Project Management Unit No 3 with 1 bidding package.
29/06/2023 10:27
The Bid solicitor Project Management Unit No 3 has posted the request Approving the Plan for selecting contractors for the preparation of investment Works: Repairing partial damage to the road surface section Km119+200 – Km119+400; Km127 – Km127+250; Km127+400 – Km128+050; Handling unsafe traffic points at Km126+080, National Highway 10, Nam Dinh province. of the investor Project Management Unit No 3 with 1 bidding package.
29/06/2023 10:15
Project Management Unit No 3 Posted Development Investment Project Repairing damaged foundation, road surface section Km148+750 – Km155+730, National Highway 10, Ninh Binh province.
29/06/2023 10:10
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package 4: Construction supervision consultancy of the investor Project Management Unit No 3.
- Winning bidder: CÔNG TY CỔ PHẦN SƠN HẢI
20/06/2023 13:56
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package 4: Construction supervision consultancy of the investor Project Management Unit No 3.
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
16/06/2023 09:47
Bid solicitor Project Management Unit No 3 has posted Tender Notice Tender package No 3: Construction of the investor Project Management Unit No 3 with the form Open bidding.
06/06/2023 11:35
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit No 3.
- Winning bidder: CÔNG TY CỔ PHẦN VIỆT XUÂN HÀ NỘI
02/06/2023 13:56
Bid solicitor Project Management Unit No 3 has posted Tender Notice Tender package No 3: Construction of the investor Project Management Unit No 3 with the form Open bidding.
31/05/2023 15:12
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package No. 2: Consulting Surveying, making construction drawing design and cost estimate of the investor Project Management Unit No 3.
25/05/2023 15:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Unit No 3 has posted 2 of the contractor selection plan, which contains 2 of the bidding package. See full list here
Summary: The Bid solicitor Project Management Unit No 3 posted 3 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Unit No 3 has posted 21 Tender Notice in the 19 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit No 3 has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Unit No 3 has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit No 3 has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit No 3 is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Project Management Unit No 3 is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code