Bidding package RAI/CS13: Consulting survey, making design documents, construction drawings and cost estimates.
Watching
Project
Contractor selection plan
Prequalification Notice
Prequalification results
Bid award
Prequalification Notice ID
20211186105-00
Contractor selection methods
Competitive Bidding
Publication status
Offical notice
Procurement Category
Other capital
Name of Tender Notice
Bidding package RAI/CS13: Consulting survey, making design documents, construction drawings and cost estimates.
Prequalifying invitation documents . release time
Place of issue and receipt of Prequalifying invitation documents
Prequalification opening date
Name of project
Project on upgrading and expanding National Highway 9 from Cua Viet port to National Highway 1, using residual capital of Vietnam Road Asset Management Project, loan from WB
List of attached files:
Number |
Text type name |
Filename |
Download files |
1 |
Decide (approval/modify) the dossier of invitation for pre-qualification |
QD 5841.pdf |
Download
|
2 |
Prequalification documents |
VRAMP REOI QL9CS13 ky phat hanh 25 11 2021.pdf |
Download
|