Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế và Hạ tầng huyện Tiểu Cần as follows:
- Has relationships with 0 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 41 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 37 packages that have not fully posted the contractor selection results. Of these 34 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 409,630,000 VND, of which the total winning bid value is: 409,630,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế và Hạ tầng huyện Tiểu Cần as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 409,630,000 VND, in which the total winning value is: 409,630,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 5 investment and development projects.
- As the owner of 8 Contractor selection plan in which 8 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 7 bidding packages in which 0 packages are self-invited, and 7 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request The plan for selecting contractor for the repair of the road in cluster 6, Tieu Can town (Pair of Long Son pagodas) phase 2 of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 4 bidding package.
07/07/2023 17:44
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Approving the contractor selection plan in the stage of preparation for investment and construction of the repair work of cluster 6, Tieu Can town (the pair of Long Son pagodas) phase 2 of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 3 bidding package.
07/07/2023 17:32
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần Posted Development Investment Project Repairing the traffic road of cluster 6, Tieu Can town (Pair of Long Son pagodas) phase 2.
07/07/2023 17:17
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Plan to select contractor for road repair work in Cay He hamlet, Phu Can commune, Tieu Can district in order to fulfill grade IV criteria of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 6 bidding package.
06/07/2023 11:37
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the results of the bidding package Package 07: Construction supervision consultancy of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần.
05/07/2023 18:01
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the results of the bidding package Package 17: Construction supervision consultant (greenery part) of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần.
05/07/2023 17:57
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần Posted Development Investment Project Repairing Rach Ca Tre street, cluster 5, Cau Quan town.
26/06/2023 18:18
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Contractor selection plan in the preparation stage for investment and construction of the repair work of Ca Tre canal, cluster 5, Cau Quan town of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 3 bidding package.
26/06/2023 17:59
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần Posted Development Investment Project Repairing sidewalks and drainage system of National Highway 60 in Lo Ngo market area, Hieu Tu commune.
26/06/2023 17:17
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Contractor selection plan in the stage of preparation for investment and construction of pavement repair and drainage system National Highway 60 area Lo Ngo market, Hieu Tu commune of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 3 bidding package.
26/06/2023 17:03
The data sheet has been partially hidden, to see the full information please Login or Register
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan The plan for selecting contractor for the repair of the road in cluster 6, Tieu Can town (Pair of Long Son pagodas) phase 2 with 4 bidding package .
07/07/2023 17:44
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan Approving the contractor selection plan in the stage of preparation for investment and construction of the repair work of cluster 6, Tieu Can town (the pair of Long Son pagodas) phase 2 with 3 bidding package .
07/07/2023 17:32
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan Plan to select contractor for road repair work in Cay He hamlet, Phu Can commune, Tieu Can district in order to fulfill grade IV criteria with 6 bidding package .
06/07/2023 11:37
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần announced the results of the bid package Package 07: Construction supervision consultancy .
- Winning bidder:
05/07/2023 18:01
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần announced the results of the bid package Package 17: Construction supervision consultant (greenery part) .
- Winning bidder:
05/07/2023 17:57
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan Contractor selection plan in the preparation stage for investment and construction of the repair work of Ca Tre canal, cluster 5, Cau Quan town with 3 bidding package .
26/06/2023 17:59
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan Contractor selection plan in the stage of preparation for investment and construction of pavement repair and drainage system National Highway 60 area Lo Ngo market, Hieu Tu commune with 3 bidding package .
26/06/2023 17:03
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan The plan for selecting contractors in the preparation stage for investment and construction of road repair works in Cay He hamlet, Phu Can commune, Tieu Can district in order to fulfill grade IV criteria with 3 bidding package .
26/06/2023 16:26
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần announced the results of the bid package Bidding package No. 10: Consultancy on preparation of Bid Documents, evaluation of Bid Package No. 07 .
- Winning bidder:
23/06/2023 16:02
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần publishes the plan Plan to select contractor for the project of Renovating and upgrading the bypass of Highway 60, Tieu Can town with 14 bidding package .
15/06/2023 11:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request The plan for selecting contractor for the repair of the road in cluster 6, Tieu Can town (Pair of Long Son pagodas) phase 2 of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 4 bidding package.
07/07/2023 17:44
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Approving the contractor selection plan in the stage of preparation for investment and construction of the repair work of cluster 6, Tieu Can town (the pair of Long Son pagodas) phase 2 of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 3 bidding package.
07/07/2023 17:32
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần Posted Development Investment Project Repairing the traffic road of cluster 6, Tieu Can town (Pair of Long Son pagodas) phase 2.
07/07/2023 17:17
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Plan to select contractor for road repair work in Cay He hamlet, Phu Can commune, Tieu Can district in order to fulfill grade IV criteria of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 6 bidding package.
06/07/2023 11:37
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the results of the bidding package Package 07: Construction supervision consultancy of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần.
05/07/2023 18:01
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the results of the bidding package Package 17: Construction supervision consultant (greenery part) of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần.
05/07/2023 17:57
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần Posted Development Investment Project Repairing Rach Ca Tre street, cluster 5, Cau Quan town.
26/06/2023 18:18
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Contractor selection plan in the preparation stage for investment and construction of the repair work of Ca Tre canal, cluster 5, Cau Quan town of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 3 bidding package.
26/06/2023 17:59
Phòng Kinh tế và Hạ tầng huyện Tiểu Cần Posted Development Investment Project Repairing sidewalks and drainage system of National Highway 60 in Lo Ngo market area, Hieu Tu commune.
26/06/2023 17:17
The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted the request Contractor selection plan in the stage of preparation for investment and construction of pavement repair and drainage system National Highway 60 area Lo Ngo market, Hieu Tu commune of the investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần with 3 bidding package.
26/06/2023 17:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted 8 of the contractor selection plan, which contains 41 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần is the owner of 8 contractor selection plan. In which, they self-invite 8 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Phòng Kinh tế và Hạ tầng huyện Tiểu Cần is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code