Upgrading DT.763 road, section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Item of relocation of medium and low voltage lines, transformer stations and lighting section from Km8+300 to Km15) +000 and the section from Km24+000 to Km29+500)
Upgrading DT.763 road, section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Item of relocation of medium and low voltage lines, transformer stations and lighting section from Km8+300 to Km15) +000 and the section from Km24+000 to Km29+500)
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
838 - QĐ - UBND.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Tender package No 53 (consultation): Evaluation of bidding documents (E-HSMT) and evaluation of contractor selection results for package No. 52
Central budget capital is 170 billion VND (including sections from Km8+300 to Km15+000 and Km24+000 to the end of the route), the rest is invested from the provincial budget.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
2.Tender package No 52 (construction and equipment): Item relocation of medium and low voltage lines, transformer stations and lighting sections from Km8+300 to Km15+000 and Km24+000 to Km29+500; work contents according to construction design shall be deployed after the approved basic design and attached Appendix II.
Central budget capital is 170 billion VND (including sections from Km8+300 to Km15+000 and Km24+000 to the end of the route), the rest is invested from the provincial budget.
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
3.Package 54: Risk insurance of the investor during the construction process of package No. 52
Central budget capital is 170 billion VND (including sections from Km8+300 to Km15+000 and Km24+000 to the end of the route), the rest is invested from the provincial budget.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
4.Package 55 (consulting): Supervision of implementation of package No. 52
Central budget capital is 170 billion VND (including sections from Km8+300 to Km15+000 and Km24+000 to the end of the route), the rest is invested from the provincial budget.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Upgrading DT.763 road, section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Item of relocation of medium and low voltage lines, transformer stations and lighting section from Km8+300 to Km15) +000 and the section from Km24+000 to Km29+500)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Upgrading DT.763 road, section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Item of relocation of medium and low voltage lines, transformer stations and lighting section from Km8+300 to Km15) +000 and the section from Km24+000 to Km29+500)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.