Bidder Selection Plan

Repairing the road surface from about Km3+600 to Km8+000 and building a drainage system from about Km3+300 to Km3+500, the section from about Km7+300 to Km7+650 (on the right side) of the provincial road .769B, Nhon Trach district

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:41 08/06/2023
Contractor Selection Plan ID
PL2300089797-00
Publishing time
09:36 08/06/2023
Posting Status
Published
Contractor selection plan name
Repairing the road surface from about Km3+600 to Km8+000 and building a drainage system from about Km3+300 to Km3+500, the section from about Km7+300 to Km7+650 (on the right side) of the provincial road .769B, Nhon Trach district
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Location
Authority that issues the decision
CHỦ TỊCH ỦY BAN NHÂN DÂN TỈNH ĐỒNG NAI
Approval date
07/06/2023
Approval ID
1339/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 4
1.Package 03 (non-consulting): Risk insurance of the investor during construction of package 01.
Tender/ Prequalification Notice ID
Contract execution period
495 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
traffic career
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
2.Package 01 (construction): Repairing the road surface from about Km3+600 to Km8+000 and building a drainage system from about Km3+300 to Km3+500, the section from about Km7+300 to Km7+ 650 (right line) on provincial road DT.769B, Nhon Trach district (including ensuring traffic safety).
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
traffic career
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
3.Package 02 (consulting): Appraisal of bidding documents (E-HSMT) and evaluation of contractor selection results for package No. 01.
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
traffic career
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
4.Tender package No 04 (consulting): Construction supervision of package No. 01.
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
traffic career
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repairing the road surface from about Km3+600 to Km8+000 and building a drainage system from about Km3+300 to Km3+500, the section from about Km7+300 to Km7+650 (on the right side) of the provincial road .769B, Nhon Trach district". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repairing the road surface from about Km3+600 to Km8+000 and building a drainage system from about Km3+300 to Km3+500, the section from about Km7+300 to Km7+650 (on the right side) of the provincial road .769B, Nhon Trach district" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second