Bidder Selection Plan

Repairing damage to foundation and road surface Km555+300-Km557+700;Km558+300-Km560+700;Adding drainage ditch along sections Km556+00-Km556+800(P);Km556+185-Km556+815 (T);Km560+958-Km561+356(P);Km560+880-Km561+313(T);Km569+421.5-Km569+707.5(P);Km571+797-Km572+326(T) ); Repairing Da bridge Km555+345;Dong Bo bridge Km592+564;Repairing traffic signal lights at Km573+350;Reinforcing the roof of the tunnel Km594+050-Km594+180(T)(road to Deo Ngang tunnel) );Addition of inspection level for Mu Luoc bridge Km563+828;Dong Muoi Km593+492 National Highway 1, Ha Tinh province

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 11:22 19/04/2023
Contractor Selection Plan ID
PL2300001507-01
Publishing time
08:26 19/04/2023
Posting Status
Published
Contractor selection plan name
Repairing damage to foundation and road surface Km555+300-Km557+700;Km558+300-Km560+700;Adding drainage ditch along sections Km556+00-Km556+800(P);Km556+185-Km556+815 (T);Km560+958-Km561+356(P);Km560+880-Km561+313(T);Km569+421.5-Km569+707.5(P);Km571+797-Km572+326(T) ); Repairing Da bridge Km555+345;Dong Bo bridge Km592+564;Repairing traffic signal lights at Km573+350;Reinforcing the roof of the tunnel Km594+050-Km594+180(T)(road to Deo Ngang tunnel) );Addition of inspection level for Mu Luoc bridge Km563+828;Dong Muoi Km593+492 National Highway 1, Ha Tinh province
Name of project
Repairing damage to foundation and road surface Km555+300-Km557+700;Km558+300-Km560+700;Adding drainage ditch along sections Km556+00-Km556+800(P);Km556+185-Km556+815 (T);Km560+958-Km561+356(P);Km560+880-Km561+313(T);Km569+421.5-Km569+707.5(P);Km571+797-Km572+326(T) ); Repairing Da bridge Km555+345;Dong Bo bridge Km592+564;Repairing traffic signal lights at Km573+350;Reinforcing the roof of the tunnel Km594+050-Km594+180(T)(road to Deo Ngang tunnel) );Addition of inspection level for Mu Luoc bridge Km563+828;Dong Muoi Km593+492 National Highway 1, Ha Tinh province
Investment objective
To ensure traffic safety, work drainage, limit the increase in damage to the road surface, bridge works, and at the same time increase the exploitation capacity and service life of the works.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Location
Ha Tinh province
Authority that issues the decision
Cục Đường bộ Việt Nam
Approval date
05/04/2023
Approval ID
1397/QĐ-CĐBVN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Tender package No 3: Construction
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Non-business spending on road economic activities (State budget)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
Fixed unit price
Prequalification
No
Location
2.Package number 5: Consultancy on quality inspection of works
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Capital source: Non-business spending on road economic activities (State budget)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
3.Package 4: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Capital source: Non-business spending on road economic activities (State budget)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
4.Package 02: Consultancy on surveying, design of construction materials and making estimates
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
State budget (non-business funding for road economic activities).
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repairing damage to foundation and road surface Km555+300-Km557+700;Km558+300-Km560+700;Adding drainage ditch along sections Km556+00-Km556+800(P);Km556+185-Km556+815 (T);Km560+958-Km561+356(P);Km560+880-Km561+313(T);Km569+421.5-Km569+707.5(P);Km571+797-Km572+326(T) ); Repairing Da bridge Km555+345;Dong Bo bridge Km592+564;Repairing traffic signal lights at Km573+350;Reinforcing the roof of the tunnel Km594+050-Km594+180(T)(road to Deo Ngang tunnel) );Addition of inspection level for Mu Luoc bridge Km563+828;Dong Muoi Km593+492 National Highway 1, Ha Tinh province". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repairing damage to foundation and road surface Km555+300-Km557+700;Km558+300-Km560+700;Adding drainage ditch along sections Km556+00-Km556+800(P);Km556+185-Km556+815 (T);Km560+958-Km561+356(P);Km560+880-Km561+313(T);Km569+421.5-Km569+707.5(P);Km571+797-Km572+326(T) ); Repairing Da bridge Km555+345;Dong Bo bridge Km592+564;Repairing traffic signal lights at Km573+350;Reinforcing the roof of the tunnel Km594+050-Km594+180(T)(road to Deo Ngang tunnel) );Addition of inspection level for Mu Luoc bridge Km563+828;Dong Muoi Km593+492 National Highway 1, Ha Tinh province" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second