Bidder Selection Plan

Planning and measurement consultancy: Right bank of the Ma River (the section from the hard bridge to the upstream is 520m), Song Ma district, Son La province

  Watching  
Project Contractor selection plan Bid award
Find: 10:03 14/06/2023
Contractor Selection Plan ID
PL2300094424-00
Publishing time
09:58 14/06/2023
Posting Status
Published
Contractor selection plan name
Planning and measurement consultancy: Right bank of the Ma River (the section from the hard bridge to the upstream is 520m), Song Ma district, Son La province
Name of project
Embankment on the right bank of the Ma River (from the hard bridge to the upstream 520m), Song Ma district, Son La province
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Location
Authority that issues the decision
UBND huyện Sông Mã
Approval date
13/06/2023
Approval ID
2114/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Package 03: Investigating and surveying the construction of specific land prices for compensation and support for the construction of works
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Revenues for granting land use rights from the district budget; Additional sources to balance the district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location
Sông Mã District, Sơn La
2.Tender package No 01: Extracting cadastral measurements at the rate of 1/500 for compensation and support for construction work
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Revenues for granting land use rights from the district budget; Additional sources to balance the district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location
Sông Mã District, Sơn La
3.Package 02: Inspection, acceptance and acceptance of cadastral measurements at the scale of 1/500 for compensation and support work for construction
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Revenues for granting land use rights from the district budget; Additional sources to balance the district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location
Sông Mã District, Sơn La

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Planning and measurement consultancy: Right bank of the Ma River (the section from the hard bridge to the upstream is 520m), Song Ma district, Son La province". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Planning and measurement consultancy: Right bank of the Ma River (the section from the hard bridge to the upstream is 520m), Song Ma district, Son La province" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second