Bidder Selection Plan

Plan for selecting contractor for the project of Anti-erosion embankment project on Tien river bank (section from Cai Doi river to the old My Thuan ferry wharf), Tan Hoa ward, Vinh Long city

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 14:55 27/05/2023
Contractor Selection Plan ID
PL2300045524-02
Publishing time
14:54 27/05/2023
Posting Status
Published
Contractor selection plan name
Plan for selecting contractor for the project of Anti-erosion embankment project on Tien river bank (section from Cai Doi river to the old My Thuan ferry wharf), Tan Hoa ward, Vinh Long city
Name of project
Anti-erosion embankment of Tien river (section from Cai Doi river to old My Thuan ferry terminal), Tan Hoa ward, Vinh Long city, Vinh Long province
Investment objective
In order to overcome the river bank erosion, protect people's lives and properties, public works; synchronously combining with regional technical infrastructure works, contributing to anti-flooding and urban embellishment for the area of ​​Tan Hoa and Tan Hoi wards in the conditions of climate change adaptation, contributing to the stabilization and improvement of urban areas. Improve living conditions for people in the project area, develop local socio-economic development
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
3 Years
Location
Authority that issues the decision
Ủy ban nhân dân tỉnh Vĩnh Long
Approval date
27/03/2023
Approval ID
634/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 30
1.Tender package No 8: Preparation of E-HSMT and evaluation of E-HSDT for consulting bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
2.Tender package No 9: Preparation of E-HSMT and evaluation of E-HSDT for consulting bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
3.Package 10: Survey, design construction drawings, estimate return of electrical system technical infrastructure
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
4.Package 12: Construction supervision of construction and installation bidding package No. 3
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
5.Package 2: Preparing E-HSMT and evaluating E-HSDT for consulting bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
6.Package 15: Quality inspection of construction bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
7.Package 14: Construction supervision of construction and installation bidding package No. 4
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
8.Tender package No 21: E-HSMT preparation and E-HSDT evaluation of non-consulting bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
9.Tender package No 24: Project Management
Tender/ Prequalification Notice ID
Contract execution period
1000 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2023
Type of contract
Package and Adjusted Unit Price
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
10.Package 3: Construction and return of electrical system technical infrastructure
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
11.Package 4: Clearing mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
12.Package 3: Verification of construction drawing design and estimate of consultancy bidding package No. 1 (excluding water traffic safety assurance for construction work)
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
13.Package 11: Verification of construction drawing design, estimated return of technical infrastructure of electrical system
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
14.Package 13: Surveying, making technical construction plans, estimation of demining, mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
15.Package 5: E-HSMT preparation and E-HSDT evaluation for construction and installation bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
16.Package 16: Quality inspection of construction and installation bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
17.Package 17: Inspecting and accepting construction of the underwater part for the construction of construction and installation bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
18.Tender package No 19: Construction Audit
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
19.Tender package No 22: E-HSMT preparation and E-HSDT evaluation of non-consulting bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
20.Package 2: Construction and installation of embankments (from K0+671 to the end of the route), open culverts, construction and return of technical infrastructure of water supply system and assurance of navigation safety for construction works
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
Fixed unit price
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
21.Package 1: Construction of embankment (from K0+00 to K0+670), construction and return of technical infrastructure of water supply system and assurance of navigation safety for construction work
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
Fixed unit price
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
22.Package 6: Construction supervision of construction and installation bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
23.Package 20: E-HSMT preparation and E-HSDT evaluation of consulting bidding package No. 19.
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
24.Package 18: Inspection and acceptance of construction of underwater parts for construction of construction and installation bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
25.Package 23: Verification of estimates to ensure safe navigation for construction works
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
26.Tender package No 2: Insurance for construction and installation bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
27.Tender package No 1: Insurance for construction and installation bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
28.Package 1: Survey, design construction drawings and estimate construction works, embankment items, open culverts, return the technical infrastructure of the water supply system and ensure navigation safety in service of the construction. works
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
29.Package 4: Preparation of E-HSMT and evaluation of E-HSDT for construction and installation bidding package No. 1
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long
30.Tender package No 7: Construction supervision of construction and installation bidding package No. 2
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget to support the period 2021 - 2025 is 220 billion VND and the local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Vĩnh Long City, Vĩnh Long

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractor for the project of Anti-erosion embankment project on Tien river bank (section from Cai Doi river to the old My Thuan ferry wharf), Tan Hoa ward, Vinh Long city". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractor for the project of Anti-erosion embankment project on Tien river bank (section from Cai Doi river to the old My Thuan ferry wharf), Tan Hoa ward, Vinh Long city" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second