Bidder Selection Plan

Plan for contractor selection package: Prepare economic and technical report on repair of 3rd floor coal pouring house and power station No. 6, No. 7 and Bun ke 3004A, 3004B, 5016, 5017, 5018 Department of Road 5, Road 6, floor steel on the 2nd floor, the main contractor of Vang Danh 1 coal processing plant

  Watching  
Project Contractor selection plan Bid award
Find: 11:51 22/06/2023
Contractor Selection Plan ID
PL2300101131-00
Publishing time
09:48 22/06/2023
Posting Status
Published
Contractor selection plan name
Plan for contractor selection package: Prepare economic and technical report on repair of 3rd floor coal pouring house and power station No. 6, No. 7 and Bun ke 3004A, 3004B, 5016, 5017, 5018 Department of Road 5, Road 6, floor steel on the 2nd floor, the main contractor of Vang Danh 1 coal processing plant
Name of project
Economic and technical report on repair of the 3rd floor of the coal pouring house and power stations No. 6, No. 7 and Bun ke 3004A, 3004B, 5016, 5017, 5018 Department of Road 5, Street 6, Steel Floor 2, the main recruiter of the factory. Vang Danh coal 1
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Location
Authority that issues the decision
Công ty CP Than Vàng Danh-Vinacomin;
Approval date
16/06/2023
Approval ID
1233/QĐ-TVD
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Bidding package: Prepare technical economic report on repair of 3rd floor coal pouring house and power stations No. 6, No. 7 and Bun ke 3004A, 3004B, 5016, 5017, 5018 Department of 5th Street, 6th Street, 2nd floor steel floor, main contractor of Vang Danh 1 coal processing plant
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Accounting in production and business expenses in 2023-2024 of Danh . Gold Coal Joint Stock Company
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
Uông Bí City, Quảng Ninh

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for contractor selection package: Prepare economic and technical report on repair of 3rd floor coal pouring house and power station No. 6, No. 7 and Bun ke 3004A, 3004B, 5016, 5017, 5018 Department of Road 5, Road 6, floor steel on the 2nd floor, the main contractor of Vang Danh 1 coal processing plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for contractor selection package: Prepare economic and technical report on repair of 3rd floor coal pouring house and power station No. 6, No. 7 and Bun ke 3004A, 3004B, 5016, 5017, 5018 Department of Road 5, Road 6, floor steel on the 2nd floor, the main contractor of Vang Danh 1 coal processing plant" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second