Bidder Selection Plan

LCNT plan, bidding package: Consulting survey, making design documents, construction drawings and estimates of major repair in 2024. Category: Head Dam Project – Son La Hydropower Plant. Categories: Non-Spill Dam RCC and Spillway CVC. Section: i) Treatment of lime seepage in the corridor walls of CNN H3, H4 from a height of 180m to a height of 216m; ii) Heat penetration treatment of J21/22, J22/23, J23/24, J24/25 at elevation of 217.30m and elevation of 228.10m

  Watching  
Project Contractor selection plan Bid award
Find: 08:18 30/06/2023
Contractor Selection Plan ID
PL2300107343-00
Publishing time
08:17 30/06/2023
Posting Status
Published
Contractor selection plan name
LCNT plan, bidding package: Consulting survey, making design documents, construction drawings and estimates of major repair in 2024. Category: Head Dam Project – Son La Hydropower Plant. Categories: Non-Spill Dam RCC and Spillway CVC. Section: i) Treatment of lime seepage in the corridor walls of CNN H3, H4 from a height of 180m to a height of 216m; ii) Heat penetration treatment of J21/22, J22/23, J23/24, J24/25 at elevation of 217.30m and elevation of 228.10m
Procurement name
Preliminary estimate of major repair in 2024. List: Main Dam Project – Son La Hydropower Plant. Categories: Non-Spill Dam RCC and Spillway CVC. Section: i) Treatment of lime seepage in the corridor walls of CNN H3, H4 from a height of 180m to a height of 216m; ii) Heat penetration treatment of J21/22, J22/23, J23/24, J24/25 at elevation of 217.30m and elevation of 228.10m
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Location
Authority that issues the decision
Công ty thủy điện Sơn La
Approval date
28/06/2023
Approval ID
532/QĐ-TĐSL
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Consultancy, survey, preparation of design documents, construction drawings and estimates of major repair in 2024. List: Main Dam - Son La Hydropower Plant. Categories: Non-Spill Dam RCC and Spillway CVC. Section: i) Treatment of lime seepage in the corridor walls of CNN H3, H4 from a height of 180m to a height of 216m; ii) Heat penetration treatment of J21/22, J22/23, J23/24, J24/25 at elevation of 217.30m and elevation of 228.10m
Tender/ Prequalification Notice ID
Contract execution period
450 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Major repair cost of Son La Hydropower Company in 2024
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2023
Type of contract
Package and Fixed Price
Prequalification
No
Location
Mường La District, Sơn La

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "LCNT plan, bidding package: Consulting survey, making design documents, construction drawings and estimates of major repair in 2024. Category: Head Dam Project – Son La Hydropower Plant. Categories: Non-Spill Dam RCC and Spillway CVC. Section: i) Treatment of lime seepage in the corridor walls of CNN H3, H4 from a height of 180m to a height of 216m; ii) Heat penetration treatment of J21/22, J22/23, J23/24, J24/25 at elevation of 217.30m and elevation of 228.10m". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "LCNT plan, bidding package: Consulting survey, making design documents, construction drawings and estimates of major repair in 2024. Category: Head Dam Project – Son La Hydropower Plant. Categories: Non-Spill Dam RCC and Spillway CVC. Section: i) Treatment of lime seepage in the corridor walls of CNN H3, H4 from a height of 180m to a height of 216m; ii) Heat penetration treatment of J21/22, J22/23, J23/24, J24/25 at elevation of 217.30m and elevation of 228.10m" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second