Bidder Selection Plan

Invest in building medium and low voltage lines and handle overload protection of substations in Binh Minh Power area in 2022

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 17:27 19/04/2023
Contractor Selection Plan ID
PL2300012258-01
Publishing time
17:26 19/04/2023
Posting Status
Published
Contractor selection plan name
Invest in building medium and low voltage lines and handle overload protection of substations in Binh Minh Power area in 2022
Name of project
Invest in building medium and low voltage lines and handle overload protection of substations in Binh Minh Power area in 2022
Investment objective
- Solve the situation of overloading the substation, shortening the power supply radius; - Ensure stable grid operation, increase reliability of power supply, improve power quality; - Reducing the risk of causing unsafety incidents, reducing power loss; - Reducing technical power loss on the grid, ensuring the quality of power supplied to customers
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2023 Years
Location
Vinh Long province
Authority that issues the decision
Công ty Điện lực Vĩnh Long
Approval date
07/02/2023
Approval ID
216/QĐ-PCVL
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Construction
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Commercial loan and reciprocal capital granted by Vinh Long Power Corporation to Vinh Long Power Company
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Invest in building medium and low voltage lines and handle overload protection of substations in Binh Minh Power area in 2022". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Invest in building medium and low voltage lines and handle overload protection of substations in Binh Minh Power area in 2022" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second