Bidder Selection Plan

Invest in and install a non-stop electronic toll collection system for using road services at Phu Huu BOT toll station under the project of Building a road connecting Nguyen Duy Trinh street to Phu Huu Industrial Park, Thu Duc city

  Watching    
Project Contractor selection plan Tender notice Bid award
Find: 09:58 22/06/2023
Contractor Selection Plan ID
PL2300100120-00
Publishing time
09:52 22/06/2023
Posting Status
Published
Contractor selection plan name
Invest in and install a non-stop electronic toll collection system for using road services at Phu Huu BOT toll station under the project of Building a road connecting Nguyen Duy Trinh street to Phu Huu Industrial Park, Thu Duc city
Name of project
Invest in and install a non-stop electronic toll collection system for using road services at Phu Huu BOT toll station under the project of Building a road connecting Nguyen Duy Trinh street to Phu Huu Industrial Park, Thu Duc city
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Hội đồng quản trị Công ty cổ phần Xi măng Vicem Hà Tiên
Approval date
20/06/2023
Approval ID
13/06/QĐ-HĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Mixed bidding package: Design - supply of materials and equipment, installation of equipment -Construction of works and related services (Plot 1: Invest and provide automatic toll collection service at Front-end, Lot 2: Invest in and provide automatic toll collection services at Back-end, Value of Lot 2 is calculated as a percentage of revenue of tollgate, Time is implemented according to operating time of tollgate )
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Own capital and from the project's payback fee income
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
Package and Fixed Price
Prequalification
No
2.Completed project finalization audit.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
3.Design verification
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Invest in and install a non-stop electronic toll collection system for using road services at Phu Huu BOT toll station under the project of Building a road connecting Nguyen Duy Trinh street to Phu Huu Industrial Park, Thu Duc city". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Invest in and install a non-stop electronic toll collection system for using road services at Phu Huu BOT toll station under the project of Building a road connecting Nguyen Duy Trinh street to Phu Huu Industrial Park, Thu Duc city" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second