Bidder Selection Plan

Contractor selection plan for component project 3 of Chau Doc - Can Tho - Soc Trang expressway construction investment project phase 1 (3rd time)

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:18 05/06/2023
Contractor Selection Plan ID
PL2300068875-01
Publishing time
09:09 05/06/2023
Posting Status
Published
Contractor selection plan name
Contractor selection plan for component project 3 of Chau Doc - Can Tho - Soc Trang expressway construction investment project phase 1 (3rd time)
Name of project
Component 3 project of Chau Doc - Can Tho - Soc Trang expressway construction investment project phase 1
Investment objective
Forming the horizontal axis and gradually forming a network of highways in the Mekong Delta, connecting the highways along the highways, contributing to meeting the transport demand on the important horizontal axis corridor of the Mekong Delta. Long; creating space for regional development with a synchronous transport and social infrastructure system, connecting economic centers, international border gates and seaports; improve competitiveness, create linkages, promote cooperation and regional development
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Nationally Important Project
Project implementation time
6 Years
Location
Authority that issues the decision
UBND tỉnh Hậu Giang
Approval date
11/05/2023
Approval ID
773/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 30
1.Consultancy on control experiments, construction inspection, testing of bearing capacity of building structures
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
2.Consultancy for verification of construction drawing design and cost estimate of package 02: section from Km113+200 - Km131+082
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
3.Consulting on auditing completed project settlement reports
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Location
4.Construction No. 02: section from Km113+200 - Km131+082 (Including cost of ensuring water and land traffic; cost of survey, construction drawing design and project cost) room)
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
Package, Fixed Price and Adjusted Unit Price
Prequalification
No
Location
5.Consultancy on preparation of Bidding Documents and evaluation of Proposals for bidding packages: Consulting on verifying construction drawing designs and cost estimates
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
6.Consulting on setting up bid documents and evaluating bid packages: Construction insurance Construction bidding package No. 01: section from Km94+400 - Km113+200
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
7.Consulting on setting up bid documents and evaluating bid packages: Construction insurance Construction bidding package No. 02: section from Km113+200 - Km131+082
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
8.Consulting on setting up Bidding Documents and evaluating bid packages: Auditing completed project finalization reports
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Location
9.Consultancy on appraisal of bidding documents and contractor selection results for the package: Construction insurance Construction bidding package No. 01: section from Km94+400 - Km113+200
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
10.Bidding appraisal consultancy and contractor selection results for the package: Audit of the completed project's finalization report
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Location
11.Construction supervision consultant No. 01: section from Km94+400 - Km113+200 (Including supervision of road traffic assurance and survey of construction drawing design steps)
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
12.Construction supervision consultant No. 02: section from Km113+200 - Km131+082 (Including supervision of road traffic assurance and survey of construction drawing design steps)
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
13.Construction No. 01: section from Km94+400 - Km113+200 (Including cost of ensuring water and land traffic; cost of survey, construction drawing design and project cost). room)
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
Package, Fixed Price and Adjusted Unit Price
Prequalification
No
Location
14.Consulting on HSYC appraisal and contractor selection results for the package: Construction Supervision Consultant No. 02: section from Km113+200 - Km131+082 (Including supervision of road traffic assurance and surveying). close to the construction drawing design)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
15.Construction insurance for construction contract No. 01: section from Km94+400 - Km113+200
Tender/ Prequalification Notice ID
Contract execution period
70 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
16.Construction insurance for construction bidding package No. 02: section from Km113+200 - Km131+082
Tender/ Prequalification Notice ID
Contract execution period
70 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
17.Consultancy on preparation of Bidding Documents and evaluation of Proposal for bidding package: Construction No. 01: section from Km94+400 - Km113+200 (Including cost of ensuring water and land traffic; cost of survey, design of construction drawings) labor and contingency costs)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
18.Consulting on HSYC appraisal and contractor selection results for the package: Construction Supervision Consultant No. 01: section from Km94+400 - Km113+200 (Including supervision of ensuring water and land traffic and survey the design step of construction drawings)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
19.Consultancy on building norms and unit prices
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
20.Consultancy on appraisal of bidding documents and contractor selection results for the package: Construction insurance Construction bidding package No. 02: section from Km113+200 - Km131+082
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
21.Consulting for environmental monitoring and monitoring
Tender/ Prequalification Notice ID
Contract execution period
46 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
22.Consultancy for verification of construction drawing design and estimate of package number 01: section from Km94+400 - Km113+200
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
23.HSYC appraisal consultancy and contractor selection results for the package: Construction No. 02: section from Km113+200 - Km131+082 (Including cost of survey, construction drawing design and contingency cost )
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
24.Consulting on appraisal of HSYC and results of contractor selection for the package: Consulting on verifying construction drawing design and cost estimate
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
25.Consultancy on preparation of Bid Documents and evaluation of Proposal for bidding package: Construction No. 02: section from Km113+200 - Km131+082 (Including cost of ensuring water and land traffic; cost of survey, design of construction drawings. labor and contingency costs)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
26.Consultancy on preparation of Bidding Documents and evaluation of Proposal Packages: Consulting for environmental monitoring and supervision
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
27.Consulting for HSYC appraisal and contractor selection results for the package: Environmental monitoring and monitoring consultancy
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
28.HSYC appraisal consultancy and contractor selection results for the package: Construction No. 01: section from Km94+400 - Km113+200 (Including cost of survey, construction drawing design and contingency cost )
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
29.Consultancy on preparation of Bidding Documents and evaluation of Proposal Package: Construction Supervision Consultant No. 02: section from Km113+200 - Km131+082 (Including supervision of road traffic assurance and survey of design steps. construction drawings)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
30.Consultancy on preparation of Bidding Documents and evaluation of Proposal for the package: Construction Supervision Consultant No. 01: section from Km94+400 - Km113+200 (Including supervision of ensuring water and land traffic and survey of design steps. construction drawings)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget and local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for component project 3 of Chau Doc - Can Tho - Soc Trang expressway construction investment project phase 1 (3rd time)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for component project 3 of Chau Doc - Can Tho - Soc Trang expressway construction investment project phase 1 (3rd time)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second