Bidder Selection Plan

Contractor selection plan Bidding package No. XL.08-DTXD2022: “Supply of materials and construction and installation” Belongs to the following projects: + “Building a connection circuit between 470E1.4 and 472E1.4 highways”; + "Moving the boundary of Ha Dong - Chuong My, renovating Oanh Thuong branch and Bien Giang pumping branch after receiving"; + "Strengthening power supply capacity for low-voltage grid in Ha Dong district";

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:36 21/04/2023
Contractor Selection Plan ID
PL2300057297-00
Publishing time
16:35 21/04/2023
Posting Status
Published
Contractor selection plan name
Contractor selection plan Bidding package No. XL.08-DTXD2022: “Supply of materials and construction and installation” Belongs to the following projects: + “Building a connection circuit between 470E1.4 and 472E1.4 highways”; + "Moving the boundary of Ha Dong - Chuong My, renovating Oanh Thuong branch and Bien Giang pumping branch after receiving"; + "Strengthening power supply capacity for low-voltage grid in Ha Dong district";
Name of project
Building the link between the 470E1.4 and 472E1.4 highways; Move and measure the Ha Dong - Chuong My boundary, renovate Oanh Thuong branch and Bien Giang pump branch after receiving; Strengthening power supply capacity for low-voltage grid in Ha Dong district.
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Công ty Điện lực Hà Đông
Approval date
18/04/2023
Approval ID
986/QĐ-PCHADONG
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Tender package No XL.08-DTXD2022: “Supplying materials and constructing construction”
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Capital depreciation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan Bidding package No. XL.08-DTXD2022: “Supply of materials and construction and installation” Belongs to the following projects: + “Building a connection circuit between 470E1.4 and 472E1.4 highways”; + "Moving the boundary of Ha Dong - Chuong My, renovating Oanh Thuong branch and Bien Giang pumping branch after receiving"; + "Strengthening power supply capacity for low-voltage grid in Ha Dong district";". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan Bidding package No. XL.08-DTXD2022: “Supply of materials and construction and installation” Belongs to the following projects: + “Building a connection circuit between 470E1.4 and 472E1.4 highways”; + "Moving the boundary of Ha Dong - Chuong My, renovating Oanh Thuong branch and Bien Giang pumping branch after receiving"; + "Strengthening power supply capacity for low-voltage grid in Ha Dong district";" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second