Bidder Selection Plan

Approval of the design and construction plan for the package to equip TVs, refrigerators, other CCDCs at the Labor Department and pantry area on the 8th floor

  Watching  
Project Contractor selection plan Bid award
Find: 09:21 29/06/2023
Contractor Selection Plan ID
PL2300093415-02
Publishing time
09:15 29/06/2023
Posting Status
Published
Contractor selection plan name
Approval of the design and construction plan for the package to equip TVs, refrigerators, other CCDCs at the Labor Department and pantry area on the 8th floor
Procurement name
Equipped with TV, refrigerator, other CCDC at Labor Room and pantry area on 8th floor
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Location
Authority that issues the decision
Tổng Giám đốc Công ty Cổ phần Chứng khoán NH Đầu tư và Phát triển Việt Nam
Approval date
23/06/2023
Approval ID
399/QĐ-BSC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Bidding package number, total investment, Lowest bid price, Highest bid price, Approval date, Approval ID, Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 1
1.Equipped with TV, refrigerator, tools and other tools on the 8th floor BSC
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Source of working capital of the Company
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2023
Type of contract
All in One
Prequalification
No
Location
Hoàn Kiếm District, Hà Nội

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Approval of the design and construction plan for the package to equip TVs, refrigerators, other CCDCs at the Labor Department and pantry area on the 8th floor". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Approval of the design and construction plan for the package to equip TVs, refrigerators, other CCDCs at the Labor Department and pantry area on the 8th floor" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second