Bidder Selection Plan

1. Renovate the 35kV line 371E19.7 from poles 114 to DCL-3 (Hong Hoa Yen Binh branch) and switch connections to 373E19.7 road to supply electricity to Yen Quang Industrial Park and Tien Tien Industrial Complex; 2. Constructing 22kV and 35kV feeder after Kim Boi 110kV substation (02 feeder 35kV + 03 feeder 22kV); 3. Renovating and upgrading medium and low voltage power grids in the two communes of Hang Kia and Pa Co - Mai Chau district, Hoa Binh province

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 13:07 13/06/2023
Contractor Selection Plan ID
PL2300093295-00
Publishing time
09:12 13/06/2023
Posting Status
Published
Contractor selection plan name
1. Renovate the 35kV line 371E19.7 from poles 114 to DCL-3 (Hong Hoa Yen Binh branch) and switch connections to 373E19.7 road to supply electricity to Yen Quang Industrial Park and Tien Tien Industrial Complex; 2. Constructing 22kV and 35kV feeder after Kim Boi 110kV substation (02 feeder 35kV + 03 feeder 22kV); 3. Renovating and upgrading medium and low voltage power grids in the two communes of Hang Kia and Pa Co - Mai Chau district, Hoa Binh province
Procurement name
1. Renovate the 35kV line 371E19.7 from poles 114 to DCL-3 (Hong Hoa Yen Binh branch) and switch connections to 373E19.7 road to supply electricity to Yen Quang Industrial Park and Tien Tien Industrial Complex; 2. Constructing 22kV and 35kV feeder after Kim Boi 110kV substation (02 feeder 35kV + 03 feeder 22kV); 3. Renovating and upgrading medium and low voltage power grids in the two communes of Hang Kia and Pa Co - Mai Chau district, Hoa Binh province
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Location
Authority that issues the decision
Công ty Điện lực Hòa Bình- Chi nhánh Tổng Công ty Điện lực Miền Bắc
Approval date
02/06/2023
Approval ID
868/QĐ-PCHB
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Consulting on making construction survey reports; Prepare economic and technical reports
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVNNPC's commercial and scientific investment capital in 2023
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "1. Renovate the 35kV line 371E19.7 from poles 114 to DCL-3 (Hong Hoa Yen Binh branch) and switch connections to 373E19.7 road to supply electricity to Yen Quang Industrial Park and Tien Tien Industrial Complex; 2. Constructing 22kV and 35kV feeder after Kim Boi 110kV substation (02 feeder 35kV + 03 feeder 22kV); 3. Renovating and upgrading medium and low voltage power grids in the two communes of Hang Kia and Pa Co - Mai Chau district, Hoa Binh province". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "1. Renovate the 35kV line 371E19.7 from poles 114 to DCL-3 (Hong Hoa Yen Binh branch) and switch connections to 373E19.7 road to supply electricity to Yen Quang Industrial Park and Tien Tien Industrial Complex; 2. Constructing 22kV and 35kV feeder after Kim Boi 110kV substation (02 feeder 35kV + 03 feeder 22kV); 3. Renovating and upgrading medium and low voltage power grids in the two communes of Hang Kia and Pa Co - Mai Chau district, Hoa Binh province" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second