Invitation To Bid ( ITB, Tender Notice)

Tender package No 5: Experimental VTTB for the 2nd phase of land use-control-SCTX-DPSC in 2023

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 19:19 10/07/2023
Notice Status
Published
Category
Non-Consulting
Name of project
Estimation: Procurement of VTTB to serve the 2nd phase of mobile phone use-SCTX-DPSC in 2023
Bidding package name
Tender package No 5: Experimental VTTB for the 2nd phase of land use-control-SCTX-DPSC in 2023
Contractor Selection Plan ID
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
Production and business expenses of Dong Nai Electricity One Member Co., Ltd
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Time of bid closing
10:00 21/07/2023
Validity of bid documents
90 days
Business lines
Approval ID
1316/QĐ-PCĐN
Approval date
06/07/2023 08:55
Approval Authority
Công ty TNHH MTV Điện lực Đồng Nai
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
19:18 10/07/2023
to
10:00 21/07/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
10:00 21/07/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Commitment
Bid security amount
8.000.000 VND
Amount in words
Eight million dong

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of goods:

Form No. 01D. Goods list (applied for unit price contracts):

Number Category Amount Calculation Unit Description Execution location since date The latest delivery date Note
1 Thí nghiệm Sứ đứng 24kV (bọc chì) 47 Cái Theo quy định tại Chương V
2 Thí nghiệm Sứ treo 24kV polymer 152 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
3 Thí nghiệm Cầu chì tự rơi (FCO) 22KV 100A Polymer 110 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
4 Thí nghiệm Dao cách ly (DS) 1pha 24kV - 630A cách điện polymer 150 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
5 Thí nghiệm LA 18kV-10kA polymer 100 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
6 Thí nghiệm Máy cắt hạ thế (MCB) 2 cực 50A 3000 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
7 Thí nghiệm Máy cắt hạ thế (MCB) 2 cực 63A 4000 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
8 Thí nghiệm Máy cắt hạ thế (MCB) 3 cực 50A 100 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
9 Thí nghiệm Máy cắt hạ thế (MCB) 3 cực 80A 100 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
10 Thí nghiệm Máy cắt hạ thế kiểu vỏ đúc (MCCB) 3 cực 320A 10 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20
11 Thí nghiệm Máy cắt hạ thế kiểu vỏ đúc (MCCB) 3 cực 630A 15 Cái Theo quy định tại Chương V Tỉnh Đồng Nai 20

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH MỘT THÀNH VIÊN ĐIỆN LỰC ĐỒNG NAI as follows:

  • Has relationships with 11 contractor.
  • The average number of contractors participating in each bidding package is: 0 contractors.
  • Proportion of bidding fields: Goods 59.76%, Construction 10.98%, Consulting 8.54%, Non-consulting 20.73%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 47,288,570,700 VND, in which the total winning value is: 42,331,094,669 VND.
  • The savings rate is: 10.48%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 5: Experimental VTTB for the 2nd phase of land use-control-SCTX-DPSC in 2023". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 5: Experimental VTTB for the 2nd phase of land use-control-SCTX-DPSC in 2023" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Views: 0

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second