Invitation To Bid ( ITB, Tender Notice)

Tender package No 1: Procurement of equipment Winch, Pump, Air compressor, Blower, Electric train, Drilling machine, Jaw crusher

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:55 30/06/2023
Notice Status
Published
Category
Goods
Name of project
Project contractor selection plan: Investing and maintaining production of Lang Hich Zinc Factory in 2023
Bidding package name
Tender package No 1: Procurement of equipment Winch, Pump, Air compressor, Blower, Electric train, Drilling machine, Jaw crusher
Contractor Selection Plan ID
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Own capital + Commercial loan
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Time of bid closing
08:00 10/07/2023
Validity of bid documents
105 days
Business lines
Approval ID
Quyết định số 1931/QĐ-TMC
Approval date
30/06/2023 10:46
Approval Authority
Giám đốc Công ty
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
10:46 30/06/2023
to
08:00 10/07/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
08:00 10/07/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter
Bid security amount
60.000.000 VND
Amount in words
Sixty million dong

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of goods:

Form No. 01A – Goods list:

Number Category Amount Calculation Unit Description Execution location since date The latest delivery date Note
1 Máy nén khí trục vít (lưu lượng 4,5 m3/ph, động cơ 22kW) 5 cái Theo quy định tại Chương V
2 Tời 5 tấn và tủ điều khiển trọn bộ (tốc độ vận chuyển 1,5m/s, động cơ 90kW) 1 cái Theo quy định tại Chương V Xí nghiệp kẽm chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75
3 Bơm nước phục vụ thoát nước mỏ (lưu lượng max 72m3/h, cột áp max 123m) 3 cái Theo quy định tại Chương V Xí nghiệp kẽm chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75
4 Quạt gió hướng trục (lưu lượng: 130÷240 m3/phút; áp suất: 500÷2400 Pa; động cơ 11kW) 3 cái Theo quy định tại Chương V Xí nghiệp kẽm chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75
5 Tàu điện ắc quy 2,5 tấn (bao gồm: 01 Tàu điện + 01 bộ ắc qui theo máy + 01 bộ ắc qui dự phòng + 04 xe goòng 0,65 m3) 1 bộ Theo quy định tại Chương V Xí nghiệp Kẽm Chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75
6 Bơm thải xưởng tuyển (Q≥ 40 m3/h; H≥70m) 2 cái Theo quy định tại Chương V Xí nghiệp Kẽm Chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75
7 Máy khoan thăm dò (chiều sâu lỗ khoan 300m) 1 bộ Theo quy định tại Chương V Xí nghiệp Kẽm Chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75
8 Máy đập hàm (kích thước miệng vào 150mm x 750mm) 1 cái Theo quy định tại Chương V Xí nghiệp Kẽm Chì Làng Hích, xã Tân Long, huyện Đồng Hỷ, tỉnh Thái Nguyên 75 75

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Công ty Cổ phần Kim loại màu Thái Nguyên - Vimico as follows:

  • Has relationships with 0 contractor.
  • The average number of contractors participating in each bidding package is: 0 contractors.
  • Proportion of bidding fields: Goods 55.56%, Construction 0%, Consulting 44.44%, Non-consulting 0%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
  • The savings rate is: 0%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 1: Procurement of equipment Winch, Pump, Air compressor, Blower, Electric train, Drilling machine, Jaw crusher". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 1: Procurement of equipment Winch, Pump, Air compressor, Blower, Electric train, Drilling machine, Jaw crusher" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Views: 0

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second