Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Warning: DauThau.info detected time to evaluate and approve result of this tender notice does not meet Article 12 Bidding Law 2013-- You will be rewarded if you detect false warnings! See instructions here!
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register
Number | Job Description Bidding | Amount | Calculation Unit | Technical requirements/Main technical instructions | Note |
---|---|---|---|---|---|
1 | MẶT ĐƯỜNG BONG LÓC | ||||
1.1 | Đào xử lý kết cấu mặt đường bị bong lóc dày tb 15cm (50% KL) | 12.62 | m3 | ||
1.2 | Lớp móng trên bằng đá dăm nước dày 15cm | 168.29 | m2 | ||
1.3 | Tưới nhũ tương thấm bám CSS-1 TCN 1,0kg/m2 | 168.29 | m2 | ||
2 | NỀN ĐƯỜNG | ||||
2.1 | Cắt bê tông | 623.68 | m | ||
2.2 | Cào bóc lớp bê tông xi măng | 31.18 | m3 | ||
2.3 | Đắp nền + đắp lề | 15.14 | m3 | ||
2.4 | Đào khuôn | 801.86 | m3 | ||
2.5 | Đào rãnh | 2404.68 | m3 | ||
2.6 | Đắp trả rãnh | 1300.93 | m3 | ||
2.7 | Phá dỡ rãnh cũ bê tông bị hư hỏng | 270.54 | m3 | ||
3 | MẶT ĐƯỜNG | ||||
3.1 | Thảm mặt đường bằng BTN C16 dày 5cm | 8832.25 | m2 | ||
3.2 | Tưới nhũ tương dính bám CRS-1 TCN 0,5kg/m2 | 8832.25 | m2 | ||
3.3 | Bù vênh + thảm mặt đường bằng đá dăm đen dày tb 5cm | 6857.6 | m2 | ||
3.4 | Thảm mặt đường bằng đá dăm đen dày 4cm | 1974.65 | m2 | ||
3.5 | Tưới nhũ tương dính bám CRS-1 TCN 0,5kg/m2 | 6857.6 | m2 | ||
3.6 | Tưới nhũ tương thấm bám CSS-1 TCN 1,0kg/m2 | 1806.36 | m2 | ||
3.7 | Làm lớp móng trên bằng (4x6)cm chèn đá dăm dày 15cm | 1806.36 | m2 | ||
3.8 | Làm lớp móng dưới bằng đá (4x6)cm dày 15cm | 1806.36 | m2 | ||
3.9 | BTXM vuốt lề đường M200 | 3.22 | m3 | ||
3.10 | BTXM gia cố đến rãnh M300 dày 22cm | 402.63 | m3 | ||
3.11 | Lớp nilong tái sinh | 1830.14 | m2 | ||
4 | VUỐT NỐI ĐƯỜNG NGANG | ||||
4.1 | Thảm mặt đường bằng BTN C16 dày 5cm | 585.36 | m2 | ||
4.2 | Tưới nhũ tương dính bám CRS-1 TCN 0,5kg/m2 | 585.36 | m2 | ||
5 | VUỐT NỐI ÊM THUẬN | ||||
5.1 | Thảm mặt đường bằng BTN C16 dày 5cm | 255.99 | m2 | ||
5.2 | Tưới nhũ tương dính bám CRS-1 TCN 0,5kg/m2 | 255.99 | m2 | ||
6 | RÃNH CHỊU LỰC (ĐỔ TẠI CHỔ) | ||||
6.1 | Thân rãnh | 2065 | m | ||
6.2 | Tấm đan | 2065 | tấm | ||
7 | RÃNH CHỊU LỰC QUA ĐƯỜNG NGANG (ĐỔ TẠI CHỔ) | ||||
7.1 | Thân rãnh | 151 | m | ||
7.2 | Tấm đan | 151 | tấm | ||
8 | HOÀN TRẢ ĐƯỜNG NGANG | ||||
8.1 | Bê tông mặt đường M300, đá 1x2 | 27.18 | m3 | ||
8.2 | Đá dăm đệm móng, dày 10cm | 15.1 | m3 | ||
9 | HỐ THU (ĐỖ TẠI CHỖ) | ||||
9.1 | Hố thu | 69 | hố | ||
9.2 | Tấm đan | 69 | tấm | ||
10 | TẤM ĐAN RÃNH THAY THẾ VÀ NÂNG CAO THÀNH RÃNH ĐOẠN KM11+720 - KM11+748.44 | ||||
10.1 | Nâng cao thành rãnh | 56 | m | ||
10.2 | Tấm đan thay thế | 4 | cái | ||
11 | TẤM ĐAN RÃNH THAY THẾ VÀ NÂNG CAO THÀNH RÃNH ĐOẠN KM12+215.07 - KM12+256.43 | ||||
11.1 | Nâng cao thành rãnh | 41 | m | ||
11.2 | Tấm đan thay thế | 2 | cái | ||
12 | CỬA XẢ THOÁT NƯỚC | ||||
12.1 | Bê tông móng cống, sân cống, chân khay M150 | 8.58 | m3 |
Data analysis results of DauThau.info software for bid solicitors Ban quản lý bảo trì công trình giao thông và điều hành hoạt động vận tải hành khách công cộng as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 43,721,179,000 VND, in which the total winning value is: 43,418,255,000 VND.
- The savings rate is: 0.69%.
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code
Similar goods purchased by Bid solicitor Ban quản lý bảo trì công trình giao thông và điều hành hoạt động vận tải hành khách công cộng:
No similar goods purchased by the soliciting party were found.
Similar goods purchased by other Bid solicitors excluding Ban quản lý bảo trì công trình giao thông và điều hành hoạt động vận tải hành khách công cộng:
No similar goods have been found that other Bid solicitors have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.