Invitation To Bid ( ITB, Tender Notice)

Package XL2: Construction of Tan Buu Bridge on the main highway, parallel lines on the left branch and parallel roads from DT.830C to the intersection in the segment Km88+766 - Km90+472

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:56 01/06/2023
Notice Status
Published
Category
Civil Works
Name of project
Supplementing the contractor selection plan (Construction, supervision, insurance...), under the component project 7 of the Ho Chi Minh Ring Road 3 project: Construction of a 3-section Ring Road through Long An province
Bidding package name
Package XL2: Construction of Tan Buu Bridge on the main highway, parallel lines on the left branch and parallel roads from DT.830C to the intersection in the segment Km88+766 - Km90+472
Contractor Selection Plan ID
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Central budget capital (about 75%) and provincial budget capital (about 25%)
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Two Envelopes
Contract Type
Package, Fixed Price and Adjusted Unit Price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Related announcements
Time of bid closing
09:30 12/06/2023
Validity of bid documents
180 days
Business lines
Approval ID
554/QĐ-SGTVT
Approval date
22/05/2023 07:53
Approval Authority
Sở Giao thông vận tải Long An
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
09:45 01/06/2023
to
09:30 12/06/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:30 12/06/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter
Bid security amount
27.000.000.000 VND
Amount in words
Twenty seven billion dong

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1 Khảo sát địa hình Theo quy định tại Chương V
1.1 Đo vẽ mặt cắt dọc ở trên cạn. Cấp địa hình II 32.482 100m Theo quy định tại Chương V
1.2 Đo vẽ mặt cắt dọc ở dưới nước. Cấp địa hình I 0.65 100m Theo quy định tại Chương V
1.3 Đo vẽ mặt cắt ngang ở trên cạn. Cấp địa hình II 16.715 100m Theo quy định tại Chương V
2 Khảo sát địa chất Theo quy định tại Chương V
2.1 Khoan xoay bơm rửa để lấy mẫu ở trên cạn. Độ sâu hố khoan từ 0m đến 30m. Cấp đất đá I -III (hiệp khoan > 0,5m) 64 m khoan Theo quy định tại Chương V
2.2 Thí nghiệm xuyên tiêu chuẩn SPT. Cấp đất đá cấp I-III 32 1 lần TN Theo quy định tại Chương V
2.3 Thí nghiệm mẫu đất nguyên dạng (cơ lý hóa) 11 chỉ tiêu Theo quy định tại Chương V
2.4 Thí nghiệm mẫu đất không nguyên dạng (cơ lý hóa) 7 chỉ tiêu Theo quy định tại Chương V

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1 Thiết kế bản vẽ thi công và dự toán 1 Toàn bộ

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH TƯ VẤN ĐẤU THẦU TRỌNG TÍN as follows:

  • Has relationships with 7 contractor.
  • The average number of contractors participating in each bidding package is: 1.00 contractors.
  • Proportion of bidding fields: Goods 6.25%, Construction 81.25%, Consulting 3.13%, Non-consulting 9.38%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 21,144,199,749 VND, in which the total winning value is: 20,602,649,379 VND.
  • The savings rate is: 2.56%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package XL2: Construction of Tan Buu Bridge on the main highway, parallel lines on the left branch and parallel roads from DT.830C to the intersection in the segment Km88+766 - Km90+472". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package XL2: Construction of Tan Buu Bridge on the main highway, parallel lines on the left branch and parallel roads from DT.830C to the intersection in the segment Km88+766 - Km90+472" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Views: 1

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second