Invitation To Bid ( ITB, Tender Notice)

Package 25: Procurement of supplies and materials for maintenance, reinforcement, addition, and replacement of the system of garbage barriers at the canal head, CNN garbage buoys and flood warning buoys in 2023 - Song Ba Hydropower Plant Summer

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 18:39 19/07/2023
Notice Status
Published
Category
Goods
Name of project
Plan for selecting contractors for the 8th phase in 2023 - Bidding packages for consultancy, maintenance, repair and procurement of materials and tools for disaster prevention and industrial engineering in 2023 - Song Ba Ha Hydropower Plant
Bidding package name
Package 25: Procurement of supplies and materials for maintenance, reinforcement, addition, and replacement of the system of garbage barriers at the canal head, CNN garbage buoys and flood warning buoys in 2023 - Song Ba Hydropower Plant Summer
Contractor Selection Plan ID
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
Business capital in 2023
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competitive Offer
Contract Execution Location
Time of bid closing
16:30 26/07/2023
Validity of bid documents
120 days
Business lines
Approval ID
1707/QĐ-SBH
Approval date
19/07/2023 00:00
Approval Authority
Tổng giám đốc Công ty
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
16:16 19/07/2023
to
16:30 26/07/2023
Document Submission Fees
220.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
16:30 26/07/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter
Bid security amount
10.500.000 VND
Amount in words
Ten million five hundred thousand dong

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of goods:

Form No. 01A – Goods list:

Number Category Amount Calculation Unit Description Execution location since date The latest delivery date Note
1 Dây cáp Ø20 300 Mét Theo quy định tại Chương V
2 Dây cáp Ø8 200 Mét Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
3 Cùm cáp inox Ø20 100 Bộ Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
4 Cùm cáp inox Ø8 45 Bộ Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
5 Phao nhựa, có lỗ luồng cáp ở giữa 117 Cái Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
6 Xăng chạy cano 150 Lít Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
7 Găng tay bảo hộ sợi Poly 30 Đôi Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
8 Thép Ø18 120 Kg Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
9 Thép Ø16 55 Kg Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45
10 Thép tấm 200x10mm 220 Kg Theo quy định tại Chương V Hồ chứa nước - Nhà máy thủy điện Sông Ba Hạ, xã Suối Trai, huyện Sơn Hòa, tỉnh Phú Yên 30 45

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors CÔNG TY CỔ PHẦN THỦY ĐIỆN SÔNG BA HẠ as follows:

  • Has relationships with 0 contractor.
  • The average number of contractors participating in each bidding package is: 0 contractors.
  • Proportion of bidding fields: Goods 66.67%, Construction 0%, Consulting 13.33%, Non-consulting 20.00%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
  • The savings rate is: 0%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 25: Procurement of supplies and materials for maintenance, reinforcement, addition, and replacement of the system of garbage barriers at the canal head, CNN garbage buoys and flood warning buoys in 2023 - Song Ba Hydropower Plant Summer". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 25: Procurement of supplies and materials for maintenance, reinforcement, addition, and replacement of the system of garbage barriers at the canal head, CNN garbage buoys and flood warning buoys in 2023 - Song Ba Hydropower Plant Summer" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Views: 0

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second