Invitation To Bid ( ITB, Tender Notice)

Package 03: Consulting for making environmental impact assessment report Project: 110kV transmission line from 220kV Bac Ninh 3 substation - Chau Khe and Dong Tho 110kV substation

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:29 24/04/2023
Notice Status
Published
Category
Consulting
Name of project
KHLCNT Package No. 03: Consulting for making environmental impact assessment report Project: 110kV transmission line from 220kV Bac Ninh 3 substation - Chau Khe and 110kV Dong Tho substation
Bidding package name
Package 03: Consulting for making environmental impact assessment report Project: 110kV transmission line from 220kV Bac Ninh 3 substation - Chau Khe and Dong Tho 110kV substation
Contractor Selection Plan ID
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
EVNNPC
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Two Envelopes
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Time of bid closing
09:00 15/05/2023
Validity of bid documents
90 days
Business lines
Approval ID
255/QĐ-BDADL
Approval date
24/04/2023 00:00
Approval Authority
Ban quản lý dự án phát triển điện lực
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
10:28 24/04/2023
to
09:00 15/05/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 15/05/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Job category:

Form No. 01A: Bill of Quantities, applied for fixed-price contracts:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1 Xây dựng đề cương chi tiết của báo cáo 1 toàn bộ
2 ĐIỀU TRA KHẢO SÁT THU THẬP SỐ LIỆU 1 toàn bộ
3 LẤY MẪU, ĐO ĐẠC, PHÂN TÍCH HIỆN TRẠNG MÔI TRƯỜNG KHU VỰC DỰ ÁN, CỘNG ĐỒNG DÂN CƯ VÀ ĐÁNH GIÁ TÁC ĐỘNG TIỀM TÀNG ẢNH HƯỞNG ĐẾN MÔI TRƯỜNG KHI DỰ ÁN HOẠT ĐỘNG
3.1 Phân tích chất lượng môi trường không khí: 01 mẫu/ 1 xã - Nhiệt độ - Độ ẩm không khí - Tốc độ gió - Hướng gió - CO - NO2 - SO2 1 mẫu
3.2 Phân tích mức ồn cực đại 1 mẫu
3.3 Phân tích nước mặt: - Chất rắn lơ lửng - pH - DO - TDS - COD - BOD5 - NH4+ - NO3- - Tổng N - Tổng P - Pb - Zn - Fe - As - Coliform - Dầu mỡ 1 mẫu
3.4 Phân tích nước ngầm: - pH - Chất rắn tổng số (TS) - Độ cứng (CaCO3) - NO3- - Cl- - As - Hg - Mn - Fe - Coliform 1 mẫu
3.5 Phân tích đất - Mn2+ - Zn - Fe - Pb - Cd - As 1 mẫu
4 KHẢO SÁT, XIN Ý KIẾN THAM VẤN VỀ BÁO CÁO ĐTM VÀ TỔ CHỨC HỌP THAM VẤN CỘNG ĐỒNG DÂN CƯ 1 toàn bộ
5 KHẢO SÁT ĐƯA PHƯƠNG ÁN BÃI ĐỔ THẢI ĐẤT THI CÔNG, ĐẤT HỮU CƠ TRONG QUÁ TRÌNH THI CÔNG 1 toàn bộ
6 BÁO CÁO TỔNG HỢP CÁC CĂN CỨ PHÁP LÝ, TÓM TẮT DỰ ÁN 1 toàn bộ
7 ĐIỀU KIỆN TỰ NHIÊN, KINH TẾ-XÃ HỘI VÀ HIỆN TRẠNG MÔI TRƯỜNG KHU VỰC THỰC HIỆN DỰ ÁN 1 toàn bộ
8 ĐÁNH GIÁ, DỰ BÁO TÁC ĐỘNG MÔI TRƯỜNG CỦA DỰ ÁN VÀ ĐỀ XUẤT CÁC BIỆN PHÁP, CÔNG TRÌNH BẢO VỆ MÔI TRƯỜNG, ỨNG PHÓ SỰ CỐ MÔI TRƯỜNG 1 toàn bộ
9 CHƯƠNG TRÌNH QUẢN LÝ VÀ GIÁM SÁT MÔI TRƯỜNG 1 toàn bộ
10 XÂY DỰNG VÀ ĐỀ XUẤT CÁC CHƯƠNG TRÌNH QUẢN LÝ, KIỂM SOÁT VÀ GIÁM SÁT MÔI TRƯỜNG TRONG GIAI ĐOẠN THI CÔNG 1 toàn bộ
11 XÂY DỰNG VÀ ĐỀ XUẤT CÁC CHƯƠNG TRÌNH QUẢN LÝ, KIỂM SOÁT VÀ GIÁM SÁT MÔI TRƯỜNG TRONG GIAI ĐOẠN VẬN HÀNH 1 toàn bộ
12 XÂY DỰNG BIỆN PHÁP GIẢM THIỂU Ô NHIỄM TỪ NHIỀU NGUỒN THẢI TRONG GIAI ĐOẠN THI CÔNG 1 toàn bộ
13 XÂY DỰNG BIỆN PHÁP GIẢM THIỂU Ô NHIỄM TỪ NHIỀU NGUỒN THẢI TRONG GIAI ĐOẠN VẬN HÀNH 1 toàn bộ
14 VIẾT BÁO CÁO TỔNG HỢP CỦA DỰ ÁN 1 toàn bộ
15 CHI PHÍ THẨM ĐỊNH BÁO CÁO VÀ IN ẤN HỒ SƠ 1 toàn bộ

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án phát triển Điện lực as follows:

  • Has relationships with 2 contractor.
  • The average number of contractors participating in each bidding package is: 0.00 contractors.
  • Proportion of bidding fields: Goods 23.08%, Construction 25.64%, Consulting 28.21%, Non-consulting 23.07%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 2,429,199,154 VND, in which the total winning value is: 2,076,709,633 VND.
  • The savings rate is: 14.51%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 03: Consulting for making environmental impact assessment report Project: 110kV transmission line from 220kV Bac Ninh 3 substation - Chau Khe and Dong Tho 110kV substation". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 03: Consulting for making environmental impact assessment report Project: 110kV transmission line from 220kV Bac Ninh 3 substation - Chau Khe and Dong Tho 110kV substation" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Views: 0

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second