Invitation To Bid ( ITB, Tender Notice)

Check, analyze and evaluate the status of 6.6kV engines in the overhaul of Ca Mau 2 power plant at 100,000 EOH

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:21 10/05/2023
Notice Status
Published
Category
Non-Consulting
Name of project
Check, analyze and evaluate the status of 6.6kV engines in the overhaul of Ca Mau 2 power plant at 100,000 EOH
Bidding package name
Check, analyze and evaluate the status of 6.6kV engines in the overhaul of Ca Mau 2 power plant at 100,000 EOH
Contractor Selection Plan ID
Spending category
Mandatory spending
Domestic/ International
Domestic
Range
Outside the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competitive Offer
Contract Execution Location
Time of bid closing
09:00 19/05/2023
Validity of bid documents
40 days
Business lines
Approval ID
63/QĐ-TSC
Approval date
10/05/2023 16:14
Approval Authority
GĐ Trung tâm Dịch vụ Kỹ thuật
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
16:19 10/05/2023
to
09:00 19/05/2023
Document Submission Fees
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:30 19/05/2023
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC DẦU KHÍ VIỆT NAM - CÔNG TY CỔ PHẦN - TRUNG TÂM DỊCH VỤ KỸ THUẬT as follows:

  • Has relationships with 1 contractor.
  • The average number of contractors participating in each bidding package is: 0 contractors.
  • Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 100.00%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 1,158,421,688 VND, in which the total winning value is: 1,088,670,000 VND.
  • The savings rate is: 6.02%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Check, analyze and evaluate the status of 6.6kV engines in the overhaul of Ca Mau 2 power plant at 100,000 EOH". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Check, analyze and evaluate the status of 6.6kV engines in the overhaul of Ca Mau 2 power plant at 100,000 EOH" as soon as they are posted, sign up for DauThau.info's VIP 5 package .
Views: 0

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
You did not use the site, Click here to remain logged. Timeout: 60 second