Improving the reliability of medium-voltage grid power supply in the areas of Quang Ninh province under the plan of multi-dividing and multiple-connecting in 2023 (MDMC)

Watching      
Project Overall procurement plan Contractor selection plan Contractor selection result
Found: 09:20 16/06/2023
Project number
PR2300017496-01
Notice type
Real announcement
Project name
Improving the reliability of medium-voltage grid power supply in the areas of Quang Ninh province under the plan of multi-dividing and multiple-connecting in 2023 (MDMC)
Project objective
Improving the reliability of medium-voltage grid power supply in the areas of Quang Ninh province
Investor ID
vnz000022211
Authority
Director Nguyen Thanh Tinh
Project duration
8 Month
Project Category
Group C
Use of ODA funds
No
Implementation location
Quang Ninh province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1342/QĐ-PCQN
Project approval date
08/06/2023
Approval authority
Công ty Điện lực Quảng Ninh - Chi nhánh Tổng công ty Điện lực miền Bắc
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

8.5. QD-QLDT 08062023 -PD BCKTKT MDMC 2023.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
9.172.018.124 VND
Total amount
9.172.018.124 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 1 0 0 0 1 0.00 0
You did not use the site, Click here to remain logged. Timeout: 60 second