Works: Circuits; multi-split multi-connector; Increase substation capacity in 2023 Lang Son province (Improving 35kV backbone to improve efficiency of Binh Gia – Trang Dinh loop circuit; Renovating 22kV grid to improve efficiency of northern and eastern loops of Lang Son city; Improving reliability of medium voltage grid power supply 35kV Chi Lang, Binh Gia, Bac Son areas according to the multi-split multi-connection (MDMC) plan; Increase the capacity to prevent overload of substations in 2023)

Watching    
Project Overall procurement plan Contractor selection plan
Found: 15:52 15/07/2023
Project number
PR2300032332-00
Notice type
Real announcement
Project name
Works: Circuits; multi-split multi-connector; Increase substation capacity in 2023 Lang Son province (Improving 35kV backbone to improve efficiency of Binh Gia – Trang Dinh loop circuit; Renovating 22kV grid to improve efficiency of northern and eastern loops of Lang Son city; Improving reliability of medium voltage grid power supply 35kV Chi Lang, Binh Gia, Bac Son areas according to the multi-split multi-connection (MDMC) plan; Increase the capacity to prevent overload of substations in 2023)
Investor ID
vnz000021305
Authority
Mr. Pham Ngoc Minh
Project duration
7 Month
Project Category
Group C
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
782/QĐ-EVNNPC
Project approval date
13/04/2023
Approval authority
Tổng Công ty Điện lực miền Bắc
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

LS_QĐ giao danh mục ĐTXD bổ sung năm 2023 - PC Lạng Sơn (MDMC-NPSC) (1).pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet