The project "22kV line to increase power supply in the North Binh Duong area - 2023" and the project "Mid-low voltage transmission line and substation power supply in the cultural management area of Central Delta - 2023"
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300028388-00
Notice type
Real announcement
Project name
The project "22kV line to increase power supply in the North Binh Duong area - 2023" and the project "Mid-low voltage transmission line and substation power supply in the cultural management area of Central Delta - 2023"
Authority
Le Minh Quoc Viet
Project management Type
The investor directly manages the project
Implementation location
Thành phố Thủ Dầu Một, Binh Duong province
Project approval ID
532/QĐ-PCBD và 546/QĐ-PCBD
Project approval date
31/05/2023
Approval authority
Công ty Điện lực Bình Dương
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
QDPD BCKTK - BAC BINH DUONG NAM + TRUNG TAM 2023.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet