Set up a checkpoint to control the Covid-19 epidemic at Cau Da Bac, Phuong Nam ward, Uong Bi city
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300017006-00
Notice type
Real announcement
Project name
Set up a checkpoint to control the Covid-19 epidemic at Cau Da Bac, Phuong Nam ward, Uong Bi city
Project objective
In order to control people and vehicles entering and leaving the province through Da Bac Bridge checkpoint to prevent Covid disease.
Authority
Chairman of Uong Bi City People's Committee - Mr. Pham Tuan Dat
Project management Type
The investor directly manages the project
Implementation location
Thành phố Uông Bí, Quang Ninh province
Project approval ID
4529a/QĐ-UBND
Project approval date
22/08/2021
Approval authority
Uỷ ban nhân dân thành phố Uông Bí
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
QĐ 4529a. pd bc ktkt lắp dựng chốt covid.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet