Route 22kV after Ly Thuong Kiet 110kV substation to supply power to the south of Yen My district, to the west of An Thi district, creating a communication loop with Yen My, Kim Dong and Ly Thuong Kiet 2 110kV substations (DA01); Output 35kV line after 110kV Ly Thuong Kiet substation to supply power to Yen My district, An Thi district, Hung Yen province (DA02); Output 35kV line after Nhan Hoa 110kV substation to supply power to My Hao town (DA03)
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300030809-00
Notice type
Real announcement
Project name
Route 22kV after Ly Thuong Kiet 110kV substation to supply power to the south of Yen My district, to the west of An Thi district, creating a communication loop with Yen My, Kim Dong and Ly Thuong Kiet 2 110kV substations (DA01); Output 35kV line after 110kV Ly Thuong Kiet substation to supply power to Yen My district, An Thi district, Hung Yen province (DA02); Output 35kV line after Nhan Hoa 110kV substation to supply power to My Hao town (DA03)
Project objective
Ensuring power supply for the south of Yen My district, An Thi district, creating a premise for power supply for Industrial Parks No. 03, Industrial Park No. 01, Ly Thuong Kiet Industrial Park in Ly Thuong Kiet Industrial Park and Service Urban Cluster, exploiting capacity Newly built Ly Thuong Kiet 110kV substation transformer, creating a communication loop for 22kV lines after Kim Dong 110kV substation, Yen My 110kV substation, and Ly Thuong Kiet 2 110kV substation, contributing to improving power quality and supply reliability Power supply in Yen My district, An Thi district, Hung Yen province
Authority
Mr. Luong Minh Thanh
Project management Type
The investor directly manages the project
Implementation location
Huyện Yên Mỹ, Hung Yen province
Project approval ID
293/QĐ-EVNNPC
Project approval date
22/02/2023
Approval authority
Tổng công ty Điện lực miền Bắc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
293. HY_QĐ giao danh mục ĐTXD lưới điện THT năm 2023 - PC Hưng Yên.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet