Renovating medium and low voltage power grids and substations in Song Hinh district, Phu Yen province in 2024
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300031314-00
Notice type
Real announcement
Project name
Renovating medium and low voltage power grids and substations in Song Hinh district, Phu Yen province in 2024
Project duration
12 Month
Project management Type
The investor directly manages the project
Implementation location
Phu Yen province
Project approval ID
QĐ_418_28.6.2023 GIAO KẾ HOẠCH ĐTXD 2024_PYPC
Project approval date
28/06/2023
Approval authority
Tổng công ty Điện lực miền Trung
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
QĐ_418_28.6.2023 GIAO KẾ HOẠCH ĐTXD 2024_PYPC.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet