Relocating the medium voltage power system on National Highway 62 (section from Kenh 12 bridge to the intersection with National Highway N2)

Watching    
Project Overall procurement plan Contractor selection plan
Found: 10:03 23/06/2023
Project number
PR2300027988-00
Notice type
Real announcement
Project name
Relocating the medium voltage power system on National Highway 62 (section from Kenh 12 bridge to the intersection with National Highway N2)
Investor ID
vn1101281528
Authority
People's Committee of Tan Thanh District
Project duration
1 Year
Project Category
Group C
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1617 /QĐ-UBND
Project approval date
05/06/2023
Approval authority
UBND huyện Tân Thạnh
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

1617_QĐ-UBND_05-06-2023_QD PHE DUYET .signed.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second