Pulling fiber optic cable to provide 2nd direction transmission for BTS stations in the area of VT Thuong Tin, Thanh Tri, Ung Hoa - TTVT6 in 2023
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300032234-00
Notice type
Real announcement
Project name
Pulling fiber optic cable to provide 2nd direction transmission for BTS stations in the area of VT Thuong Tin, Thanh Tri, Ung Hoa - TTVT6 in 2023
Project objective
Improve service quality, service quality, expand and strengthen broadcasting in low-frequency and weak-wave areas, ensure safety of communication to serve people, businesses and local authorities in the area to be deployed. deploying cable lines for transmission and direction 2 for BTSs
Authority
Mr. Nguyen Minh Quoc
Implementation location
Huyện Thường Tín, Ha Noi city
Project approval ID
203/QĐ-TTVT6-TH
Project approval date
20/06/2023
Approval authority
Trung tâm Viễn thông 6 - Viễn thông Hà Nội - Chi nhánh Tập đoàn Bưu chính Viễn thông Việt Nam
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet