Pulling additional AC power cable line at Lung Vu BTS station and Separating AC power cable at Macro station, remote sector is using the same infrastructure with Mobiphone station - Ha Giang province
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300030499-00
Notice type
Real announcement
Project name
Pulling additional AC power cable line at Lung Vu BTS station and Separating AC power cable at Macro station, remote sector is using the same infrastructure with Mobiphone station - Ha Giang province
Project objective
Ensure power supply for BTS stations
Project management Type
The investor directly manages the project
Implementation location
TP Hà Giang, Ha Giang province
Project approval ID
836/QĐ-VNPT-HGG-KTĐT
Project approval date
05/07/2023
Approval authority
Viễn thông Hà Giang
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet