Procurement of Ray P50, L=25m (quantity of 378 bars) for regular maintenance of national railway infrastructure in 2023

Watching          
Project Overall procurement plan Contractor selection plan Tender Notice Bid opening result Contractor selection result
Found: 09:24 06/06/2023
Project number
PR2300024400-00
Notice type
Real announcement
Project name
Procurement of Ray P50, L=25m (quantity of 378 bars) for regular maintenance of national railway infrastructure in 2023
Project objective
Regular maintenance of railway infrastructure in 2023
Investor ID
vn2900330702
Authority
Chairman of the board
Project duration
40 Day
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Nghe An province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
33/QĐ-ĐSNT ngày 25/5/2023
Project approval date
25/05/2023
Approval authority
CÔNG TY CỔ PHẦN ĐƯỜNG SẮT NGHỆ TĨNH
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

QĐ dự toán.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
16.279.602.000 VND
Total amount
16.279.602.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 0 0 0 0 1 0 16.10 0