Moving power line infrastructure for site clearance for project construction: Roads from the center of Ha Trung district to the center of Bim Son town
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300030469-00
Notice type
Real announcement
Project name
Moving power line infrastructure for site clearance for project construction: Roads from the center of Ha Trung district to the center of Bim Son town
Project objective
Return of power line infrastructure in service of site clearance and construction Project: Road from the center of Ha Trung district to the center of Bim Son town
Authority
Chairman of the District People's Committee
Project management Type
The investor directly manages the project
Implementation location
Huyện Hà Trung, Thanh Hoa province
Project approval ID
2311/QĐ-UBND
Project approval date
09/06/2023
Approval authority
Ủy ban nhân dân huyện Hà Trung
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
QD-phe-duyet(09.06.2023_09h01p11)_signed.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet