Local repair works of BTXM road surface, complete traffic safety system at Km12+250 - Km15+970 section; supplementing traffic safety protection system with guardrails for section Km11+700 - Km12+010 (on the right side) of provincial road DT.479C (Bai Dinh - Ky Phu)

Watching    
Project Overall procurement plan Contractor selection plan
Found: 14:38 06/07/2023
Project number
PR2300030617-00
Notice type
Real announcement
Project name
Local repair works of BTXM road surface, complete traffic safety system at Km12+250 - Km15+970 section; supplementing traffic safety protection system with guardrails for section Km11+700 - Km12+010 (on the right side) of provincial road DT.479C (Bai Dinh - Ky Phu)
Project objective
In order to overcome the deterioration of the route, ensure traffic safety, maintain and increase the operating capacity of the route.
Investor ID
vn2700224922
Authority
People's Committee of Ninh Binh province
Project duration
1 Year
Project Category
Group C
Use of ODA funds
No
Implementation location
Huyện Nho Quan, Ninh Binh province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
453/QĐ-UBND
Project approval date
14/06/2023
Approval authority
UBND tỉnh Ninh Bình
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

74_UBND_tinh_phe_duyet_sua_chua_DT479C_Bai_Dinh_-_Ky_Phu_(1362023)_20230613065052552550_vnpt_ca_vnpt_ca_signed_20230614041352_H42.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
6.092.854.000 VND
Total amount
6.092.854.000 VND
You did not use the site, Click here to remain logged. Timeout: 60 second