Installing battery pack No. 02 at Van Ban 110kV Station (E20.40), Tang Loong 3 110kV Station (E20.45), Sa Pa 110kV Station (E20.54)
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300027461-00
Notice type
Real announcement
Project name
Installing battery pack No. 02 at Van Ban 110kV Station (E20.40), Tang Loong 3 110kV Station (E20.45), Sa Pa 110kV Station (E20.54)
Project objective
Ensure reliable DC power supply for DC loads at Van Ban 110kV Stations (E20.40), Tang Loong 3 110kV Stations (E20.45) and Sa Pa 110kV Stations (E20.54) operated by the Electricity Company Managed by Lao Cai
Authority
Director of Lao Cai Power Company
Project management Type
The investor directly manages the project
Implementation location
Lao Cai province
Project approval ID
681/QĐ-PCLK
Project approval date
20/06/2023
Approval authority
Công ty Điện lực Lào Cai
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
3. QĐ duyet Du an AQ (1).pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet