Improving the reliability of power supply in Phu Bai Industrial Park supplemented in 2023
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300027493-00
Notice type
Real announcement
Project name
Improving the reliability of power supply in Phu Bai Industrial Park supplemented in 2023
Project objective
Improve the indicator of reliability of power supply, safe operation of the power grid, improve transmission and distribution capacity and reduce power loss on transmission lines to ensure power supply for Phu Bai Industrial Park .
Authority
Nguyen Dai Phuc
Project management Type
The investor directly manages the project
Implementation location
Thua Thien Hue province
Project approval ID
2713/QĐ-TTHPC
Project approval date
12/06/2023
Approval authority
Công ty Điện lực Thừa Thiên Huế
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
09-QD-PD-BCKTKT-NCDTC-KCN-Phu-Bai-2023.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet