Project name
Handling overload of substations in Binh Minh, Binh Tan, Tra On, Vung Liem Power areas in 2023
Project objective
Solve the situation of overloading substations, low voltage lines, shortening the power supply radius. Ensure stable grid operation, increase power supply reliability, improve power quality. Reduce the risk of causing unsafety incidents, reduce power loss
Investor ID
vnz000023627
Authority
Director of Vinh Long Power Company
Project duration
2023 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Thị xã Bình Minh, Vinh Long province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1009/QĐ-PCVL
Project approval date
03/07/2023
Approval authority
Công ty Điện lực Vĩnh Long
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

1009- QD KH lua chon 4 cong trinh xu ly qua tai.Lien.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second