Handling overload of substations in Binh Minh, Binh Tan, Tra On, Vung Liem Power areas in 2023
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300031411-00
Notice type
Real announcement
Project name
Handling overload of substations in Binh Minh, Binh Tan, Tra On, Vung Liem Power areas in 2023
Project objective
Solve the situation of overloading substations, low voltage lines, shortening the power supply radius. Ensure stable grid operation, increase power supply reliability, improve power quality. Reduce the risk of causing unsafety incidents, reduce power loss
Authority
Director of Vinh Long Power Company
Project duration
2023 Year
Project management Type
The investor directly manages the project
Implementation location
Thị xã Bình Minh, Vinh Long province
Project approval ID
1009/QĐ-PCVL
Project approval date
03/07/2023
Approval authority
Công ty Điện lực Vĩnh Long
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
1009- QD KH lua chon 4 cong trinh xu ly qua tai.Lien.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet