Equipping power, air conditioning and lightning protection equipment for stations under VNPT Net3
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300028266-00
Notice type
Real announcement
Project name
Equipping power, air conditioning and lightning protection equipment for stations under VNPT Net3
Project objective
Ensuring the power and auxiliary infrastructure, serving the installation of equipment projects to be implemented in 2023 and ensuring network safety at telecommunications stations under VNPT Net3's management
Authority
Luong Hong Khanh
Project management Type
The investor directly manages the project
Project approval ID
757/QĐ-VNPT Net3-KHĐT
Project approval date
22/06/2023
Approval authority
VNPT Net3
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
20230622_757_QĐ_VNPT Net3_KHĐT.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet