Dredging, environmental improvement, infrastructure construction of Xuyen Tam canal (from Nhieu Loc - Thi Nghe canal to Vam Thuat river) Binh Thanh district, Go Vap district
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300022305-00
Notice type
Real announcement
Project name
Dredging, environmental improvement, infrastructure construction of Xuyen Tam canal (from Nhieu Loc - Thi Nghe canal to Vam Thuat river) Binh Thanh district, Go Vap district
Project objective
solve environmental pollution, improve drainage, connect local transport and build technical infrastructure, collect wastewater to the city's centralized wastewater treatment plant
Authority
Ho Chi Minh City People's Committee
Project management Type
The investor directly manages the project
Implementation location
Quận Gò Vấp, Ho Chi Minh city
Project approval ID
64/NQ-HĐND
Project approval date
09/12/2022
Approval authority
Hội đồng nhân dân Thành phố Hồ Chí Minh
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
64.NQ-HĐND (09.12.2022)_CHU TRUONG DAU TU DA XUYEN TAM.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet