Construction of Khanh Hoa Power Transmission Manufacturing University

Watching    
Project Overall procurement plan Contractor selection plan
Found: 10:49 06/07/2023
Project number
PR2300030562-00
Notice type
Real announcement
Project name
Construction of Khanh Hoa Power Transmission Manufacturing University
Investor ID
vnz000021968
Authority
3 . Power Transmission Company
Project duration
2 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Thành phố Nha Trang, Khanh Hoa province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
3468/QĐ-PTC3
Project approval date
23/06/2023
Approval authority
Công ty Truyền tải điện 3
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

QD phe duyet tkbvtc nha khanh hoa.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second