Construction and construction project of the slope of the Bang Nau waste dump
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300024922-00
Notice type
Real announcement
Project name
Construction and construction project of the slope of the Bang Nau waste dump
Project objective
- Connecting the drainage system from the +110 floor to the +80 floor of the water slope system No. 1 in order to lead surface water to the No. 5 rock-blocking dam and exit to Bang Ba stream.
- Ensure the ability to drain surface water to the east of Bang Nau dumping site to the area of the rock-blocking dam No. 5, then drain to Bang Bai stream.
- Directing surface water to the east of Bang Nau dumping ground to the area of the rock-blocking dam No. 8, then draining to Bang Ba stream through the slope system of No. 2.
- Ensure effective surface water drainage for the entire Bang Nau dumping site.
Project management Type
The investor hires a project management consultant
Implementation location
Thành phố Cẩm Phả, Quang Ninh province
Project approval ID
4059/QĐ-TCS-ĐM
Project approval date
05/06/2023
Approval authority
Giám đốc Công ty cổ phần Than Cao Sơn - TKV
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
2023-6-5số 4059-QĐ.PhêDA-KHLCNT(DADốcNướBNâu.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
1
|
|
10.159.515.960 VND |
Total amount |
10.159.515.960 VND |