Building a model of rice production in the summer-autumn crop in 2023 using funds for management and use of rice land in Quynh Hau commune.
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300027061-00
Notice type
Real announcement
Project name
Building a model of rice production in the summer-autumn crop in 2023 using funds for management and use of rice land in Quynh Hau commune.
Project objective
Building a model of production of Nep Huong rice variety in association with product consumption in order to apply new varieties, apply scientific and technological advances, reduce production costs, increase productivity and economic efficiency per unit area, and promote manufacture.
Project management Type
The investor directly manages the project
Implementation location
Huyện Quỳnh Lưu, Nghe An province
Project approval ID
1289/QĐ-UBND
Project approval date
02/06/2023
Approval authority
UBND huyện Quỳnh Lưu, tỉnh Nghệ An
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet